Under federal law, local governments are compensated through various programs for losses to
their tax bases due to the presence of most federally owned land. These lands cannot be taxed, but
may create demand for services such as fire protection, police cooperation, or simply longer roads
to skirt the federal property. Some of these programs are run by specific agencies, and apply only
to that agency’s land. The most widely applicable program, run by the Department of the Interior
(DOI), applies to many types of federally owned land, and is called “Payments in Lieu of Taxes,”
or PILT. The authorized level of PILT payments is calculated under a complex formula. This
paper addresses only the DOI-run PILT program. There is no PILT-like program generally
applicable to military lands, but a small fraction of military lands are eligible for the program
described herein.
This paper explains PILT payments, with an analysis of the five major factors affecting the
calculation of a payment to a given local government. It also describes the effects of certain
changes in PILT in 1994 and 2008. The 1994 changes phased in a marked increase in the
authorized payment levels, though appropriations did not keep pace. There was intense lobbying
by local governments to convince Congress to appropriate the full amount, or to create new
mandatory spending to fund the program. A provision for mandatory spending in P.L. 110-343
will ensure that, beginning in FY2008 and continuing for four more years, all counties will
receive 100% of the authorized payment. It seems likely that there will be efforts to convert the
temporary mandatory spending into a permanent feature of PILT. With the enactment of five
years of mandatory spending, counties might also begin to debate the equity of the PILT formula
itself in future years.
Other issues have arisen concerning PILT since the program was created in 1976. One is the
inclusion of additional lands under the PILT program, particularly some or all Indian lands, which
are not now eligible for PILT. Many categories of Indian-owned lands cannot be taxed by local
governments. In some counties, this means a very substantial portion of the land is not taxable.
The remaining tax burden therefore falls more heavily on other property owners. To help
compensate for this loss, some counties have proposed that Indian lands (variously defined) be
included among those eligible for PILT payments. In addition, some counties would like to revisit
the compensation formula and emphasize a payment rate more similar to property tax rates, a
feature that would be a major change in counties with high property values. Finally, for lands in
the National Wildlife Refuge System, some would argue that all lands of the system should be
eligible for PILT, rather than continuing the PILT provision that excludes payment for acquired
lands. The exclusion affects primarily counties in eastern states, and with full funding for PILT
the lost payments represent an even larger sum. In addition, the mandatory spending provision
described above applied only to PILT, but not to the refuge system’s own payment program.
Counties with refuges would argue that the refuge fund should also provide for mandatory
spending.






Changes to PILT in the 110th Congress............................................................................................4
How PILT Works: Five Steps to Calculate Payment.......................................................................4
Step 1. How Many Acres of Eligible Lands Are There?...........................................................4
Step 2. What Is the Population in the County?..........................................................................5
Step 3. Are There Prior-Year Payments from Other Federal Agencies?...................................6
Step 4. Does the State Have Pass-Through Laws?....................................................................7
Step 5. What Is This Year’s Consumer Price Index?.................................................................8
Putting It All Together: Calculating a County’s Payment................................................................9
National Totals.........................................................................................................................11
From Authorization to Appropriation.............................................................................................11
Current Issues.................................................................................................................................11
Inclusion of Native Lands.......................................................................................................12
Inclusion of Urban Lands and Tax Equivalency.....................................................................12
National Wildlife Refuge Lands..............................................................................................13
Figure 1. Total PILT Payments, FY1993-FY2008, Actual and Inflation-Adjusted (1996)............2
Figure 2. Total PILT Payments, FY1993-FY2008, Authorized Amount and Appropriation..........3
Figure 3. Ceiling Payments Based on County Population Level, FY2008.....................................6
Figure 4. PILT Payment Level as a Function of Other Agencies’ Prior Payments
(FY2008) ...................................................................................................................................... 7
Figure 5. Steps in Calculating PILT for Eligible Federal Lands....................................................10
Table 1. PILT Payments to Selected Urban Counties, FY2008.....................................................13
Table 2. NWRS Acres Eligible for PILT in Selected States..........................................................13
Author Contact Information..........................................................................................................14





enerally, federal lands may not be taxed by state or local governments unless the
governments are authorized to do so by Congress. Since local governments are often
financed by property or sales taxes, this inability to tax the property values or products G


derived from the federal lands (whether reserved from the public domain, or acquired) may affect
local tax bases significantly. Instead of authorizing taxation, Congress has usually chosen to
create various payment programs designed to make up for lost tax revenue. These programs take
various forms. Many pertain to the lands of a particular agency (e.g., the National Forest System 1
or the National Wildlife Refuge System). The most wide-ranging payment program is called
Payments in Lieu of Taxes or PILT. It is administered by the Department of the Interior and affects
most federal lands. Exceptions include most military lands and lands under the Department of 2
Energy (DOE lands have their own smaller payment program). In FY2008, the PILT program
covered 610.1 million acres, or about 94% of all federal land.
The Payments in Lieu of Taxes Act of 1976 (P.L. 94-565, as amended, 31 U.S.C. §§ 6901-6907)
was passed at a time when U.S. policy was shifting from one of disposal of federal lands to one of
retention. Because of that shift, Congress agreed with recommendations of a federal commission
that if these federal lands were never to become part of the local tax base, then some
compensation should be offered to local governments to make up for the presence of non-taxable 3
land within their jurisdictions. Moreover, there was a long-standing concern that some federal
lands produced large revenues for local governments, while other federal lands produced little or
none. Many Members felt that the imbalance needed to be addressed. The resulting law
authorizes federal PILT payments to local governments; these payments may be used for any
governmental purpose.
Many of the issues addressed when PILT was created have continued to the present time. One
issue is the appropriate payment level and subsequent erosion of payments due to inflation. For
many years, counties held that payments were not keeping pace with inflation. Then PILT was
amended in 1994. Figure 1 shows a major increase in the actual dollars appropriated for PILT
from FY1993 to FY2008. Even adjusted for inflation, the figure indicates a substantial increase 4
over this period.

1 For more information on some of these agency-specific payment programs, see CRS Report 90-192, Fish and Wildlife
Service: Compensation to Local Governments, by M. Lynne Corn; CRS Report RL30335, Federal Land Management
Agencies' Permanently Appropriated Accounts, by Ross W. Gorte, M. Lynne Corn, and Carol Hardy Vincent; and CRS
Report RL33822, The Secure Rural Schools and Community Self-Determination Act of 2000: Forest Service Payments
to Counties, by Ross W. Gorte. The program under the Department of Energy is described in U.S. General Accounting
Office [now Government Accountability Office], Energy Management: Payments in Lieu of Taxes for DOE Property
May Need to Be Reassessed, GAO/RCED-94-204 (Washington, DC: July 1994).
2 A program to support local schools for the presence of children of federal employees, including military dependents,
provides some support to local governments, however, and to some extent compensates for lost property tax revenue
when military families live on federally owned land. For more information, see CRS Report RL34119, Impact Aid for
Public K-12 Education: Reauthorization Under the Elementary and Secondary Education Act, by Rebecca R. Skinner
and Richard N. Apling.
3 These lands may cause local government expenses such as fire protection, ambulance service, shared police
protection, or even a need for longer roads to go around the lands, but they were not viewed as adding to the counties’
jobs, at least not when compared to private ownership.
4 Inflation adjustments in this paper use the GNP chain-type price index.



Figure 1. Total PILT Payments, FY1993-FY2008,
Actual and Inflation-Adjusted (1996)
($ in millions)
000000000000400
000000000000350
000000000000
000000000000300
000000000000
000000000000 000000000000 000000000000 000000000000000000 000000000000000000 000000000000000000250
0000000000 000000000000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000200
0000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000
0000000000 000000000000000 000000000000000000 000000000000000000 000000000000000000 000000000000000000 000000000000000000 000000000000000000 000000000000000000150
0000000000 000000000000 0000000000 0000000000 000000000000000 000000000000000 000000000000000 0000000000 0000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000
0000000000 000000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000100
0000000000 000000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000
0000000000 000000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000 00000000000050
00000 000000 00000 00000 00000 00000 00000 00000 00000 000000 000000 000000 000000 000000 000000 0000000
1995 1999 2003 2007
1993 1997 2001 2005
00000000000000000000000000000000
00000000000000000000000000000000Appropriated Amount
Appropriation - adjusted
But the 1994 amendments, designed to overcome years of erosion due to inflation, have caused
the authorized payment level to increase still faster. (See Figure 2.)





Figure 2. Total PILT Payments, FY1993-FY2008,
Authorized Amount and Appropriation
($ in millions)
400
350
300
00000000 00000000 0000000000 000000 0000000000250
00000000 000000000000 000000000000 00000000 00000000 0000000000 000000 0000000000200
00000000 00000000 00000000 00000000 00000000 0000000000 000000 0000000000
0000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000 000000000000000 000000000 000000000000000000000000000000150
00000000 000000000000 00000000 000000000000 000000000000 000000000000 0000000000 00000000 00000000 00000000 00000000 00000000 00000000 0000000000 000000 00000000000000000000100
00000000 00000000 00000000 00000000 00000000 00000000 0000000000 00000000 00000000 00000000 00000000 00000000 00000000 0000000000 000000 00000000000000000000
00000000 00000000 00000000 00000000 00000000 00000000 0000000000 00000000 00000000 00000000 00000000 00000000 00000000 0000000000 000000 0000000000000000000050
00000000 00000000 00000000 00000000 00000000 00000000 0000000000 00000000 00000000 00000000 00000000 00000000 00000000 0000000000 000000 00000000000000000000
0
1995 1999 2003 2007
1993 1997 2001 2005
Authorized Amount0000000000000000
00000000000000000000000000000000
0000000000000000Appropriated Amount0000000000000000
00000000000000000000000000000000FY2008 Added Amount
Critics of PILT cite examples of what they view as its “quirkiness”: (a) while there is no 5
distinction between acquired and public domain lands for other categories of eligible lands,
acquired lands of the Fish and Wildlife Service (FWS) are not eligible for PILT—to the
consternation of many states in the East and Midwest where nearly all FWS lands are acquired; 6
(b) some of the “units of general local government” that receive large payments have other
substantial sources of revenue, while some of the counties receiving little are relatively poor; (c) a
few counties which receive very large payments from other federal revenue-sharing programs
(because of valuable timber, mining, recreation, and other uses of the lands) nonetheless are also 7
authorized to receive a minimum payment (32¢/acre) from PILT; and (d) in some counties the

5 Acquired lands are those which the United States obtained from a state or individual. Public domain lands are
generally those which the United States obtained from a sovereign nation.
6 Unit of general local government is defined in the law (31 U.S.C. § 6901(2)) asa county (or parish), township,
borough, or city where the city is independent of any other unit of general local government, that (i) is within the class
or classes of such political subdivisions in a State that the Secretary of the Interior, in his discretion, determines to be
the principal provider or providers of governmental services within the State; and (ii) is a unit of general government as
determined by the Secretary of the Interior on the basis of the same principles as were used on January 1, 1983, by the
Secretary of Commerce for general statistical purposes” plus the District of Columbia, Puerto Rico, Guam, and the
Virgin Islands. To avoid the use of the unwieldy unit of general local government, the word county will be used in the
rest of this paper, and must be understood here to be equivalent to the above definition. This shorthand is often used by
DOI.
7 This and all subsequent references to payment rates and ceilings are based on FY2008 figures unless otherwise noted.





PILT payment greatly exceeds the amount that the county would receive if the land were taxed at
fair market value, while in others it is much less. Given such problems, and the complexity of
federal land management policies, consensus on substantive change in the PILT law has been
elusive, particularly when Congress has a stated goal of reducing federal expenditures.

The Continuing Appropriations Act, 2009 (P.L. 110-329), provided the FY2008 level ($228.9
million) through March 6, 2009; if this had been the full-year appropriation, it would have
constituted roughly 61% of the estimated FY2009 level for full payment. However, §601(c) of
Division C of P.L. 110-343 (the Emergency Economic Stabilization Act of 2008) provided for
mandatory spending of the full authorized level for five years—FY2008-FY2012. For FY2008,
an additional payment is to be made to raise the FY2008 level to the full authorized amount, and
for FY2009-FY2012, the payments are to be at 100% of the authorized amount.

Calculating a particular county’s PILT payment first requires answering several questions:

1. How many acres of eligible lands are in the county?


2. What is the population of the county?


3. What was the previous year’s payment, if any, for eligible land under the other payment 8


programs of federal agencies for these lands?
4. Does the state have any laws requiring the payments from other federal agencies to be
passed through to other local government entities, such as school districts, rather than staying
with the county government?

5. What was the increase in the Consumer Price Index during the year?


Each of these questions will be discussed below. Finally, their use in the computation of each
county’s payment is described.
Nine categories of federal lands are identified in the law as eligible for PILT payments:9

8 There is only one PILT payment for all of the eligible federal land in any given county. The formula in 31 U.S.C. §
6903 sets a cap on the total PILT payment for all of the eligible land in the county, regardless of how many agencies
have jurisdiction over these eligible lands.
9 See 31 U.S.C. § 6901. The law refers to these nine categories of lands asentitlement lands,” and the term is used
throughout the act. However, because entitlement is a word which is used in a very different, and potentially confusing,
context in the congressional budget process, these lands will be called eligible lands in this paper. This paper omits
consideration of certain small payments under 31 U.S.C. §§ 6904-6905, which involve temporary compensation for
lands recently designated as wilderness, and for certain lands around Redwood National Park and Lake Tahoe. They
(continued...)





1. lands in the National Park System;


2. lands in the National Forest System;


3. lands administered by the Bureau of Land Management;


4. lands in the National Wildlife Refuge System that are withdrawn from the public domain;


5. lands dedicated to the use of federal water resources development projects;


6. dredge disposal areas under the jurisdiction of the U.S. Army Corps of Engineers;


7. land located in the vicinity of Purgatory River Canyon and Piñon Canyon, Colorado, that
was acquired after December 31, 1981, to expand the Fort Carson military reservation;
8. lands on which are located semi-active or inactive Army installations used for mobilization
and for reserve component training; and
9. certain lands acquired by DOI or the Department of Agriculture under the Southern Nevada
Public Land Management Act (P.L. 105-263).
In addition, if any lands in the above categories were exempt from real estate taxes at the time
they were acquired by the United States, those lands are not eligible for PILT, except in three
circumstances:
1. land received by the state or county from a private party for donation to the federal
government within eight years;
2. lands acquired by the state or county in exchange for land that was eligible for PILT; or
3. lands in Utah acquired by the United States if the lands were eligible for a payment in lieu
of taxes program from the State of Utah.
Only the nine categories of lands (plus the three exceptions) on this list are eligible for PILT
payments; other federal lands—such as military bases, post offices, federal office buildings, and
the like—are not eligible for PILT. The exclusion of lands in the National Wildlife Refuge System
that are acquired is an interesting anomaly, and may reflect nothing more than the House and 10
Senate committee jurisdictions at the time P.L. 94-565 was enacted.
The law restricts the payment a county may receive based on population. For example, for the
FY2008 payment, a county with a population of 1,000 people will not receive a PILT payment

(...continued)
are less than 1% of the total PILT program.
10 At the time, jurisdiction over the NWRS generally was in one committee, while jurisdiction over public domain lands
was within the jurisdiction of a different committees. This was true in both the House and Senate. The committees
considering PILT had no jurisdiction over the acquired lands within the NWRS.





over $153,500 ($153.50 per person); a jurisdiction with a population of 30,000 will not receive a
payment over $2,303,100 ($76.77 per person). In FY2008, no county may receive a PILT
payment over $3,070,500 regardless of population. Figure 3 shows the relationship between the
population of a county and the maximum PILT payment.
Figure 3. Ceiling Payments Based on County Population Level, FY2008
3500000
3000000
2500000
2000000
1500000
1000000
500000
0
100003000050000
02000040000
County Population
Federal land varies greatly in revenue production. Some lands have a large volume of timber
sales, some have recreation concessions such as ski resorts, and some generate no revenue at all.
Some federal lands have payment programs for state or local governments, and these may vary
markedly from year to year. To even out the payments among counties and prevent grossly
disparate payments, Congress provided that the previous year’s payments on eligible federal
lands from other agencies’ payment programs to counties would be subtracted from the PILT
payment of the following year. So for a hypothetical county with three categories of eligible
federal land, one paying the county $1000, the second $2000, and the third $3000, then $6000
would be subtracted from the following year’s PILT payment. Most counties are paid under this
offset provision, which is called the standard rate. In Figure 4, the standard rate is shown by the
sloping portion of the line, indicating that as the sum of the payments from other agencies
increases, the PILT payment declines.





Figure 4. PILT Payment Level as a Function of Other Agencies’ Prior Payments
(FY2008)
2.5
2
1.5
1
0.5
0
0.3 0.9 1.5 2.1
0 0.6 1.2 1.8 2.4
Other Agencies' Payments, Year 1 ($/Acre)
PILT Payment
At the same time, Congress wanted to ensure that each county got some PILT payment, however
small, even if the eligible lands produced a substantial county payment from other agencies. If the
county had payments from three federal payment programs of $1,000, $2,000, and $1 million, for
instance, subtracting $1.003 million from a small PILT payment would produce a negative
number—meaning no PILT payment to the county at all. In that case, a minimum rate applies,
which does not deduct the other agencies’ payments. In Figure 4, the flat portion to the right
shows that, after the other agencies’ payments reach a certain level, the rate of the PILT payment
remains fixed.
Counties may receive payments above the calculated amount described above, depending on state
law. Specifically, states may require that the payments from federal land agencies pass through
the county government to some other entity (typically a county school district), rather than accrue
to the county government itself. When counties in a “pass-through” state are paid under the
formula which deducts their prior year payments from other agencies (e.g., from the Refuge
Revenue Sharing Fund (RRSF; 16 U.S.C. § 715s) of FWS), or the Forest Service (FS) Payments 11
to States (16 U.S.C. § 500)), the amount paid to the other entity is not deducted from the
county’s PILT payments in the following year. According to DOI:

11 Under 16 U.S.C. § 500, these payments are made to the states or territories, and must be used for schools or roads in
the counties where the national forests are located. Each state has its own rules on the mechanics of that transfer, on
what proportion is to be used for roads and what proportion for schools. Some states direct that the education portion be
(continued...)





Only the amount of Federal land payments actually received by units of government in the
prior fiscal year are deducted. If a unit receives a Federal land payment, but is required by
State law to pass all or part of it to financially and politically independent school districts, or
any other single or special purpose district, payments are considered to have not been
received by the unit of local government and are not deducted from the Section 6902 12
payment.
For example, if a state requires all counties to pass along some or all of their RRSF payments
from FWS to the local school boards, the amount passed along is not deducted from the counties’
PILT payments for the following year (31 U.S.C. § 6907). Or if two counties of equal population
in two states each received $2,000 under the FS Payments to States, and State #1 pays that
amount directly to the local school board, but State #2 does not, then under this provision, the
PILT payment to the county in State #1 will not be reduced in the following year, but that of the
county in State #2 will drop by $2000. State #1 will have increased the total revenue coming to 13
the state and to each county by taking advantage of this feature.
Consequently, the feature of PILT that was apparently intended to even out payments among
counties (at least of equal population size) may not have that result if the state takes advantage of 14
this pass-through feature. Under 31 U.S.C. § 6903(b)(2), the governor of each state gives the
Secretary of the Interior an annual statement on the amounts actually paid to each county
government under the relevant federal agencies’ payment laws. DOI checks each governor’s
report against the records of the payment programs of federal agencies.
In addition, a state may also require that the PILT payment itself go to a smaller unit of
government, contained within county (typically a school district) (16 U.S.C. § 6907). If so, one
check is sent by the federal government to the state for distribution by the state to these smaller
units of government. The distribution must occur within 30 days. As of FY2008, Wisconsin is the
only state to have selected this feature of PILT.
A provision in the 1994 amendments to PILT adjusts the authorization levels for inflation. The
standard and minimum rates, as well as the payment ceilings, are adjusted each year. These levels
are raised based on the change in the Consumer Price Index for the 12 months ending on the
preceding June 30. This is an unusual degree of inflation adjustment; no other federal land
agency’s payment program has this feature. But as will be shown below, increases in the
authorization do not necessarily lead to a commensurate increase in the funds received by the
counties.

(...continued)
given directly to school boards. For more information see CRS Congressional Distribution Memo, Forest Service
Revenue-Sharing Payments: Distribution System, by Ross W. Gorte, Nov. 19, 1999.
12 U.S. Dept. of the Interior, Payments in Lieu of Taxes, Fiscal Year 2008, p. 11.
13 Note that even though a county as a whole may benefit from this provision, the county government itself may not, if
it must forego substantial revenues given directly to its school system.
14 However, the Supreme Court has held that states cannot direct counties to spend their PILT payments (i.e., payments
under the DOI-managed program described in this paper) for particular purposes. Lawrence County v. Lead-Deadwood
School District, No. 40-1, 469 U.S. 256 (1985).







Knowing the answers to these five questions, one can then make two comparisons to calculate the
authorized payment level for a county. (Figure 5 shows a flow chart of the steps in these
comparisons.) FY2008 payment levels are used in this paper for all charts and comparisons.
Alternative A. Which is less: the county’s eligible acreage times $2.29 per acre or the county’s
ceiling payment based on its population? Pick the lesser of these two numbers. From it, subtract
the previous year’s total payments for these eligible lands under other payment or revenue-15
sharing programs of the federal agencies that control the eligible land. The amount to be
deducted is based on an annual report from each state to DOI. This option is called the standard
provision.
Alternative B. Which is less: the county’s eligible acreage times 32¢ per acre or the county’s
ceiling payment? Pick the lesser of these two. This option is called the minimum provision, and is
used in the counties that received relatively large payments from other federal agencies in the
previous year.
The county is authorized to receive whichever of the above calculations—(A) or (B)—is greater.
This calculation must be made for all counties individually to determine the national
authorization level. From the program’s inception through FY2007, the authorized payments were
subject to annual appropriations. After passage of P.L. 110-343, this spending is mandatory for
FY2008-FY2012.
The combination of other federal payments and PILT in the standard option means that reductions
(or increases) in those other payments in the previous year could be exactly offset by increases (or
reductions) in PILT payments. However, for FY2008 (provided that the county’s population is not
so low as to affect the outcome), PILT payments cannot fall below 32¢ per acre (see step (b),
above), so the full offset occurs only when the other federal payments in the previous year total
less than $1.97 per acre (i.e., the maximum payment of $2.29 per acre minus the 32¢ per acre 16
minimum payment from PILT).

15 Payments under the Secure Rural Schools program for Forest Service lands and certain Bureau of Land Management
lands are included among those prior year payments to be deducted. See CRS Report RL33822, The Secure Rural
Schools and Community Self-Determination Act of 2000: Forest Service Payments to Counties, by Ross W. Gorte.
16 To illustrate more concretely, imagine each county as a large bucket, whose sides are marked off in “$/acre. PILT,
in effect, checks the payment already in the bucket from other agencies, then adds at least enough money to the bucket
to bring it to the $2.29/acre mark. Moreover, if the bucket is already above the $2.29/acre mark, PILT adds 32¢/acre,
regardless of the amount in the bucket already. The money bucket could reach levels of $15/acre or more, with the last
32¢ added by PILT. The county population ceilings might then be thought of as holes in the sides of some of the
buckets that prevent them from filling beyond a certain level for that bucket (i.e., county).





Figure 5. Steps in Calculating PILT for Eligible Federal Lands
(FY2008 payment levels)
Calculate ceiling
payment based
on population.
Pick the lesser of (1)Pick the lesser of (1)
eligible acres xeligible acres x $0.32/acre
$2.29/acre or (2)or (2) county’s ceiling
county’s ceiling payment.payment.
From the lesser amount,
subtract the previous
year’s payment from all
eligible lands.*
Pick the greater of these
two amounts. This is the
full payment amount.
Appropriate $. Does funding
cover authorization?
YesNo
Pay each countyPay each county aprorated share of
full amountfull amount.
Note: This is the payment from the other federal agencies managing federal lands. The amount subtracted is
reduced in states with pass-through laws.
The standard option, with its offset between other federal payments and PILT payments, still does
not guarantee a constant level of federal payments to counties, because of the time lag in
determining PILT payments. Federal payments for a given fiscal year are generally based on the
receipts of the prior year. PILT payments of the following fiscal year are offset by these payments.
To illustrate, consider a county whose only eligible federal lands are under the jurisdiction of
FWS. If the federal receipts on the FWS lands drop in FY2006 (compared to FY2005), payments
in FY2007 from the FWS Refuge Revenue Sharing Fund will fall. PILT payments will therefore
increase to offset the drop—in FY2008. (This example assumes that the PILT payment is
calculated under the standard option.) The counties will be authorized to receive at least $2.29 per





acre from RRSF and PILT payments combined,17 but the two payments would not come in the
same year. Consequently, if RRSF payments fall from year to year, the combined payments in the
given year would be less than $2.29 per acre, but if RRSF payments rise, the authorized
combined payment in the given year would be more than $2.29 per acre.
Information from all counties with eligible land is needed on a national scale before an aggregate
figure for the nation can be calculated precisely, and consequently no precise dollar figure can be 18
given in advance for each year’s PILT authorization level. However, since the amount for full
authorization for FY2008 has been calculated, and since the factors stated above are not likely, in
sum, to decrease the payments at the national level, the full authorization level for FY2009 seems
likely to be similar to the amount shown for full authorization in FY2008, which was $367
million.

Until about 1994, the full amount authorized under the law’s formula had generally been
appropriated, with a few exceptions such as sequestration under the Gramm-Rudman-Hollings
Act (Title II of P.L. 99-177). But the value of the payments fell due to inflation. In response,
Congress amended the law in 1994.
The amendment to PILT (P.L. 103-397) focused on increasing the total payments, building in 19
inflation protection, and making certain additional categories of land eligible. After the
amendments passed, the increasing discrepancy between appropriations and the rapidly rising
authorization levels led to even greater levels of frustration among local governments, and
prompted intense interest among some Members in increasing appropriations, until the passage of
P.L. 110-343. (See Figure 2, above.) Whether Congress will make the mandatory spending
permanent remains to be seen.

With the enactment of five years of mandatory spending putting the issue of full funding to rest
for the time being, three other issues are being debated: inclusion of Native lands; tax
equivalency, especially for eligible urban lands; and payments affecting the National Wildlife
Refuge System.

17 An exception would occur if the countys population is so small that the county is affected by the PILT ceiling on
payments due to population.
18 DOI does not include estimated full payment levels in its annual budget justification to Congress, and confines itself
to the Administration’s request for the year. However, DOIs annual report of current year PILT payments to counties
includes this information.
19 An important issue in 1994 was also the question of the equity of the payments and the balance struck in the payment
formula (a) between heavily and sparsely populated communities, (b) between those with federal lands generating large
revenues and those with lands generating little or no revenue, and (c) between the amounts paid under PILT and the
amounts that would be paid if the lands were simply taxed at fair market value. But these issues were not addressed in
the 1994 amendments and have scarcely been mentioned in the debate since then.





Some counties with many acres of non-taxable Indian lands within their boundaries have
supported adding Indian lands to the list of lands eligible for PILT. The complexity of the PILT
formula makes it very difficult to calculate the consequences of such a move, either for
authorization levels or appropriation levels. Congress would have to decide what sorts of “Indian 20
lands” would be eligible for such payments and a variety of other complex issues. Once the
eligible categories are determined, Congress might wish to limit payments to counties with more
than some minimum percentage of Indian lands within their borders. Regardless, even a very
restrictive definition of “Indian lands” seems likely to add millions of acres to those already
eligible. Once the criteria for eligibility were fixed, it would still be difficult to determine the
effect on authorization levels. To paint an extreme example, if all of the eligible Indian lands were
in counties whose PILT payments were already capped due to the population ceiling, inclusion of
Indian lands would have no effect on PILT authorization levels.
As long as mandatory spending is in place, appropriations would go up to fund the new lands. If
mandatory spending is allowed to expire, each county would receive a pro rata share of the full
authorized payment level. Individual counties whose eligible acres had jumped markedly with the
inclusion of Indian lands might receive substantially more than in the past. In FY2013, the
provision for mandatory spending is due to expire. If it is not extended, then annual
appropriations would need to be maintained at a much higher level to compensate for the
inclusion of millions of acres of newly eligible Indian lands. If not, most counties would not only
receive a smaller fraction of the authorized amount, but some (those with few or no eligible
Indian acres) might actually receive fewer total dollars than in the past.
Some observers have wondered whether urban federal lands are included in the PILT program.
The response is that urban lands are not excluded from PILT under the current law. For example,
in FY2008, the counties in which Sacramento, Chicago, Cleveland, and Arlington are found, as
well as the District of Columbia, all received relatively small PILT payments, as shown in Table

1.



20 The many classifications ofIndian lands include trust lands, restricted lands, and fee (private) lands, both on and
off reservations. Trust lands are lands held by the federal government in trust for an Indian tribe or individual.
Restricted lands are lands held by an Indian tribe or individual but subject to federal restrictions on alienation (e.g.,
sale) or encumbrance (e.g., mortgaging). Most, but by no means all, Indian trust and restricted lands are on Indian
reservations. Trust and restricted lands, whether on or off reservations, are not subject to state or local land taxes. On-
reservation Indian fee lands may or may not be subject to state and local land taxes, depending on the federal statute
under which the land was fee-patented. Off-reservation Indian fee lands are generally subject to state and local land
taxes. (Indian reservations may also include non-Indian fee lands, which are subject to state and local taxation.)
Alaskan Native corporation lands (none of which are trust lands) are affected by the Alaska Native Claims Settlement
Act’s limits on state taxation. Congress would have to decide which of these many classifications of Indian lands would
be subject to PILT benefits. Further, Congress might choose to distinguish between Indian lands which have never been
taxed by a county or state versus those Indian lands that were once taxable but which were acquired into non-taxable
status after some specified date.





Table 1. PILT Payments to Selected Urban Counties, FY2008
County Eligible Acres FY2008 Authorized Payment ($)
Sacramento County (CA) 9,618 22,025
Cook County (IL) 139 318
Cuyahoga County (OH) 2,592 11,239
Arlington County (VA) 27 0
District of Columbia 6,963 24,345
Note: Under the formula, Arlington County’s 27 eligible acres (all under the National Park Service) would
generate a payment of $62. However, under the law, no payment is made for amounts under $100.
Eastern counties, which tend to be small, rarely have large populations and large eligible acreage
in the same county. On the other hand, western counties tend to be very large and, like
Sacramento, may have many eligible acres as well as large populations. Furthermore, as the cases
of Arlington and the District illustrate, PILT payments are by no means acting as an equivalent to
property tax payments, since private owners of those 6,963 acres in the District or the 27 acres in
Arlington would surely pay much more than $24,345, or $0, respectively, if the land were subject
to property taxes.
Because the formula in PILT does not reflect an amount commensurate with property taxes,
counties such as these might support a revised formula that would approach property tax
payments.
As noted above, lands in the NWRS that are withdrawn from the public domain are eligible for
PILT, and those that are acquired are not. In addition, the National Wildlife Refuge Fund (NWRF)
continues to be annually appropriated, as it has been in the past. For FY2008, payments for
NWRF will be approximately 47% of the authorized level. For refuge lands eligible for PILT,
some or perhaps all of the NWRF payment will be made up for in the following year’s PILT
payment, but for acquired lands, this will not occur since they are not eligible for PILT. Congress
may consider making all refuge lands eligible for
PILT, and/or providing mandatory spending for NWRF, as it has for PILT. Eastern counties could
be the largest beneficiaries of such a change, although some western states may also have many
NWRS acres that are not currently eligible for PILT. (See Table 2 for selected state examples.)
Table 2. NWRS Acres Eligible for PILT in Selected States
Acres Reserved from Percent Eligible
State Public Domain Total NWRS Acres for PILT
Alabama 0 71,360 0.0
Arizona 1,548,670 1,729,658 89.5
Maine 0 66,710 0.0
Montana 433,135 1,387,623 31.2
Ohio 77 9,092 0.8
Oregon 267,562 580,640 46.1






M. Lynne Corn
Specialist in Natural Resources Policy