Strategic Mobility Innovation: Options and Oversight Issues

CRS Report for Congress
Strategic Mobility Innovation: Options and
Oversight Issues
April 29, 2005
Jon D. Klaus
National Defense Fellow
Foreign Affairs, Defense, and Trade Division


Congressional Research Service ˜ The Library of Congress

Strategic Mobility Innovation:
Options and Oversight Issues
Summary
Since the George W. Bush Administration announced its proposal to reduce the
U.S. military overseas basing posture, strategic mobility has been the topic of many
policy discussions. The Administration’s identification of transformation as a major
goal for the Department of Defense (DOD), technological advances, the Quadrennial
Defense Review (QDR) deployment goals, and anti-access issues also have relevance
with regard to the topic of strategic mobility. The issue for the 109th Congress is to
determine which investments should be pursued today to develop strategic mobility
platforms to meet tomorrow’s National Security Strategy requirements.
Several studies pertain to strategic mobility innovation. These studies include
the DOD’s Mobility Requirements Study for 2005, the Department of Army’s
Advanced Mobility Concepts Study (AMCS), the Institute of Defense Analyses’
Assessment of the AMCS, a Defense Science Board (DSB) Mobility Study, and the
DOD’s Transformation Planning Guidance. These studies, along with current U.S.
strategic mobility inventories and strategic mobility funding trends, all pertain to the
discussion. They examine issues such as DOD’s million-ton-mile per day
requirement, future mobility concepts and feasibilities, the importance of decreasing
the Services’ deployment footprint, transformation roadmaps, the DOD’s current
strategic mobility inventories, and airlift/sealift future funding trends.
Research identifies at least 11 potential strategic mobility platforms, which
include four sealift vehicles and seven airlift vehicles. The four sealift vehicles
assessed in this report are the Shallow-Draft High Speed Sealift, the Fast Sealift-
Monohull, the Navy Vision Trimaran High Speed Sealift, and the Navy Vision
Surface Effect Ship High Speed Sealift. The seven airlift vehicles assessed are the
Global Range Transport, the Super-Short, Take-off and Landing Aircraft, spiral
development of the C-17 - Payload/Range Expansion Program, the Ultra-Large
Airlifter, unmanned aerial vehicles, the Wing-in-Ground Effect Aircraft, and
Seaplanes.
Strategic mobility innovation raises potential oversight questions for Congress
in the following areas: (1) Does Congress have sufficient information about the
DOD’s plans for lift and potential lift platforms to adequately assess investment
options? (2) To what degree, if any, should government funding be used to develop
new lift platforms? (3) What mix of lift platforms might be appropriate to both meet
future U.S. commercial lift needs and potentially assist in meeting future military
strategic lift requirements? (4) Should any of these lift platforms be developed and
procured in part to support the defense industrial base? (5) Should procurement of
airlift/sealift be expanded beyond current DOD plans, and if so, by how much, and
with what platforms?



Contents
In troduction ......................................................1
Issue for Congress.............................................1
Factors Affecting Strategic Mobility Innovation......................1
Organization of the Report.......................................3
Studies and Background Literature....................................3
Mobility Requirements Study for 2005.............................3
Advanced Mobility Concepts Study (AMCS)........................5
Institute of Defense Analyses Assessment of the AMCS...............6
Defense Science Board -Strategic Mobility Task Force................7
Strategic Mobility Inventories....................................8
Strategic Airlift...........................................9
Strategic Sealift...........................................9
Transformation Planning Guidance...............................11
Mobility Funding Trends.......................................11
Potential Strategic Mobility Platforms.................................12
Sealift ......................................................12
Shallow Draft High Speed Sealift (SDHSS)....................13
Fast Sealift - Monohull....................................15
Navy Vision Trimaran High Speed Sealift (NVTHSS)............17
Navy Vision Surface Effects Ship High Speed Sealift............18
Intra-theater Designs with Potential Strategic Applications........19
Airlift ......................................................20
Global Range Transport (GRT)..............................21
Super Short Take-Off and Landing (SSTOL) Aircraft............23
C-17 Spiral Development (Payload & Range Expansion Program)..23
Ultra-Large Airlifters (ULA)................................24
Unmanned Aerial Vehicles (UAVs)..........................27
Wing-In-Ground Effect Aircraft.............................30
Seaplanes ...............................................31
Summary of Potential Strategic Mobility Platforms..................33
Congressional Oversight Issues......................................35
Further Study of Investment Options .............................35
Future Government Funding....................................36
Commercial Applicability......................................38
Industrial Base...............................................39
Future Procurement...........................................40
List of Figures
Figure 1: HSV...................................................10
Figure 2: SDHSS.................................................13
Figure 3: Fast Sealift - Monohull....................................15



Figure 5: NVSESHSS.............................................18
Figure 6: Global Range Transport....................................21
Figure 7: SSTOL Aircraft..........................................22
Figure 8: VTOL Crane.............................................24
Figure 9: CTOL Variant............................................25
Figure 10: WIG Aircraft............................................30
Figure 11: SEA..................................................32
List of Tables
Table 1. Mobility Funding Trends....................................12
Table 2: Summary of Potential Strategic Mobility Platforms...............33



Strategic Mobility Innovation:
Options and Oversight Issues
Introduction
Issue for Congress
With the George W. Bush Administration proposing a reduction in the U.S.
military overseas basing posture and also identifying transformation as a major goal
for the Department of Defense (DOD), the need to rapidly transport U.S. military
forces from one location to another has appeared to increase in importance.
Consequently, Congress may opt to consider what the future holds in the area of
strategic mobility innovation.
A central issue for the 109th Congress is the determination of which investments
should be pursued today to develop strategic mobility platforms to meet tomorrow’s
National Security Strategy requirements. Congressional decisions concerning this
issue could have significant implications for future U.S. military capabilities, DOD
funding requirements, the defense industrial base, and future congressional oversight
of DOD activities.
This report will examine strategic mobility innovation in airlift and sealift
used to transport cargo and personnel between theaters of operation (inter-theater).
Factors Affecting Strategic Mobility Innovation
One factor affecting strategic mobility innovation is the August 16, 2004
proposal by the Bush Administration to significantly alter the U.S. military overseas
basing posture. The proposal, if implemented, would establish new overseas
operating sites, and transfer up to 70,000 U.S. troops, plus 100,000 family members
and civilians, from Europe and Asia back to the United States. The Administration
believes that the current basing arrangements are not optimal for responding to future
military challenges.1 Many analysts believe that this change in global posture may
increase the need for additional strategic airlift and high-speed sealift. On September

23, 2004, the U.S. European Command chief, Marine Corps General James Jones,


testified to Congress that building a larger array of airlift and sealift platforms is an
“essential component” of the sweeping overhaul that would — if approved —


1 See also CRS Report RS21975, U.S. Military Overseas Basing: Background and
Oversight Issues for Congress, by Jon D. Klaus.

position U.S. forces at a number of small, dispersed bases across the European
regi on.2
A second factor affecting strategic mobility innovation is defense
transformation. Soon after taking office, the George W. Bush Administration
identified transformation as a major goal for the Department of Defense (DOD).
Since then, the DOD, the Office of Force Transformation (OFT), and the Services
have addressed the transformation process. Some observers have emphasized that
improving the strategic transportation of U.S. troops and cargo is an integral part of
this transformation process. Part of the Navy and Marine’s transformation plans
include new ship-deployment approaches called Sea Swap and Sea Basing. These
concepts call for long-duration forward deployments with crew rotations.3 Some
analysts have noted that these crew rotations will rely on strategic mobility for their
success. Part of the Army’s transformation revolves around a lighter and leaner
force.4 It would appear that an integral part of this transformation will be the ability
to rapidly transport their new combat vehicles, such as the Stryker and the Future
Combat System (FCS). The Stryker and the FCS combat vehicles were originally
designed so that they could be transported on the Air Force’s C-130. The FCS, for
example, is being designed with a 19.5-ton limit, which is the maximum weight limit
for transportation on the C-130. Some critics of this idea say that past procurement
practices have shown that a typical weapon system will increase in weight by 20%
during development, making transportation on the C-130 impossible. To date,
current designs have the vehicle, fully combat capable at delivery, weighing between
22 and 24 tons.5 Even if it can be transported on a C-130, some analysts predict that
it will need an additional two C-130s to transport the equipment and personnel to
support its operation. As the Air Force transforms, it will need to determine the right
mix of strategic assets to support both its own operations and those of the other
Services. To achieve this, the Air Force is exploiting new technologies and
operational concepts to improve its ability to rapidly deploy and sustain forces.6
A third factor is technological advances. The main idea behind innovation is
to exploit advances in technology to create new platform designs. New lighter
weight, stronger composite materials, new advanced engines or propulsion systems,
new aerodynamic designs, and new advances in computer technology may allow
innovative designs in strategic mobility assets.


2 John T. Bennett. “Increased Lift Assets Seen as Key to EUCOM Transformation Plans,”
Inside the Pentagon, Sept. 30, 2004. General Jones gave this testimony to the Senate Armed
Services Committee on Sept. 23, 2004.
3 See CRS Report RS20851, Naval Transformation: Background and Issues for Congress,
by Ronald O’Rourke, for more information on Navy transformation.
4 See CRS Report RS20787, Army Transformation and Modernization: Overview and Issues
for Congress, by Edward F. Bruner, for more information on Army transformation.
5 Jen DiMascio, “C-130J Termination Raises Questions About FCS Transportability Goal,”
Inside the Army, Vol. 17, No. 1, Jan. 10, 2005.
6 See CRS Report RS20859, Air Force Transformation, by Christopher Bolkcom, for more
information on Air Force transformation.

A fourth factor affecting strategic mobility innovation is the 2001 Quadrennial
Defense Review’s (QDR) deployment goals. The current QDR calls for deployment
goals of the so-called “1-4-2-1” and “10-30-30” strategies. The “1-4-2-1” strategy
is structured to simultaneously defend the single homeland, conduct deterrence in
four regions of the globe, execute two major campaigns in swift fashion — winning
one of them by taking over the enemy’s capital. The other strategy calls for
delivering needed forces to a theater within 10 days of a deployment order, swiftly
defeating an enemy there within 30 days, and resetting the force 30 days after that
victory.7 The next QDR is due out this Fall (2005). Its conclusions may have a
significant impact on projected strategic lift requirements.
A fifth factor is the issue of “anti-access” or “area denial.” Analysts have
argued that other countries could become increasingly unwilling to permit U.S. forces
to operate out of their country to carry out combined operations. Additionally, some
analysts have suggested that future adversaries may not freely allow U.S. forces to
build-up their forces at nearby air and sea ports, as in recent wars (e.g. Desert Storm
and Operation IRAQI FREEDOM). These access issues could affect our strategic
mobility and require the United States to start thinking about not having access to
convenient ports and airports. This concern could drive the design of high-speed,
shallow draft ships, aircraft that can go from “fort-to-fight” (global-range transports),
super-short takeoff and landing aircraft, in addition to planning for decreased local
infrastructure.
Organization of the Report
This report first examines a few mobility studies conducted by the DOD and
some relevant background literature. Secondly, the report examines innovative
designs and platforms that may meet the requirement for next-generation strategic
airlift or sealift. Finally, this report examines the potential congressional oversight
issues, which could affect future U.S. military capabilities, DOD funding
requirements, and the U.S. defense industrial base.
Studies and Background Literature
Mobility Requirements Study for 2005
In 1998, the Deputy Secretary of Defense chartered the Mobility Requirements
Study for 2005 (MRS-05). MRS-05 examined the number and mix of mobility
systems needed to support two nearly simultaneous major theater wars (MTWs) in
the year 2005. MRS-05 investigated mobility requirements in the continental United
States as well as between theaters (“strategic” or “inter-theater” mobility) and within
individual theaters (“tactical” or “intra-theater” mobility). It was conducted over two
years and was then DOD’s most comprehensive mobility study. MRS-05 was


7 “CRS Analyst Says QDR Should Include Plan for Size, Structure of Navy,” Inside the
Pentagon, Dec. 9, 2004, p. 13.

completed in 2000. At that time of the study’s release, the DOD’s airlift capability
was estimated to be approximately 44 Million-Ton-Miles per Day.8
The MRS-05 study gave the following overall assessment:9
!An airlift fleet of 49.7 Million-Ton-Miles per Day (MTM/D), the
level established after the 1995 Mobility Requirements Study
Bottom-Up Review Update (MRS-BURU), is not adequate to meet
the full range of requirements.
!To support the warfighting demands of two nearly simultaneous
MTWs, the study identified a need for a minimum of 51.1 MTM/D
of airlift capability. This number included the airlift demands
associated with deployments to the two theaters as well as support
for high-priority movements within those theaters.
!The study observed that there are likely to be other demands on the
airlift system during the peak periods of operations early in major
theater campaigns. Three of these additional demands or missions
were judged to be high-priority missions in excess of the 51.1
MTM/D capability needed for fighting two MTWs. The three
missions — conducting special operations, deploying missile
defense systems to friendly nations, and supporting other theater
commanders not directly engaged in the theater campaigns — would
yield a total airlift requirement of 54.5 MTM/D. Upon examining
all the possible missions and variations in assumptions, the study
generated a range of demands up to 67 MTM/D. The Chairman of
the Joint Chiefs of Staff, the Service Chiefs, and the CINCs
reviewed the study and supported the requirement of 54.5 MTM/D
of airlift capability as the minimum “moderate-risk” capability to
support the National Military Strategy.
!The sealift investments made in response to DOD’s 1995 MRS-
BURU were reported to be sufficient. MRS-05 found that the
DOD’s overall mobility capability could be further augmented
through aggressive use of commercial sealift enabled by selective
containerization of unit equipment. However, the study noted that
the cargo delivery requirements for two MTWs increased by one
million tons relative to the 1995 MRS-BURU projected amounts.
!The study also made inter-theater airlift and sealift
recommendations. For airlift, it was recommended that the DOD
should develop a program to provide between 51.1 MTM/D and 54.5


8 Million ton-miles per day (MTM-D) is a commonly accepted measure of performance
across the transportation industry. It reflects how much cargo can be delivered over a given
distance, in a given period of time.
9 U.S. Department of Defense, Mobility Requirements Study for 2005, Jan. 2001, pp. 4-5.

MTM/D of airlift capability. For sealift, it said that the programmed
organic dry cargo fleet was adequate to meet projected requirements.
Since the September 11, 2001 attacks and the Administration’s Global War on
Terrorism, the DOD mobility requirements are being constantly reviewed. Some
analysts have estimated that during military operations in Iraq the airlift gap between
actual and required capability was at least 10 MTM/D. Today, Air Mobility
Command (AMC) leaders say, this gap is wider — at least 15 MTM/D, perhaps 22
MTM/D.10 In 2004, Congress asked AMC to take a “quick look” comparison of the
MRS-05 projection with the actual experience in Afghanistan and Iraq. David
Merrell, chief of AMC’s studies and analysis division, estimated that the current
requirement is fast approaching 60 MTM/D.11
If the new Mobility Capability Study (MCS), due out in April 2005,
corroborates the 60 MTM/D figure, then there would appear to be an additional
projected gap of at least 5.5 MTM/D above the 54.5 MTM/D figure. Estimates (as
of March 7, 2005) have DOD’s actual MTM/D capability at approximately 45,
resulting in a projected airlift capability gap of between 9.5 MTM/D and 15 MTM/D.
According to the MRS-05, AMC should be able to reach 54.5 MTM/D with 176
C-17s, a C-5 Mission Capable (MC) rate of 65%, and a Civil Reserve Air Fleet
(CRAF) contribution of 20.5 MTM/D. Currently, AMC has 119 C-17s (not
including the 11 C-17s in Air Education and Training Command) and the C-5 has a
MC rate of approximately 68%.
According to the Air force, a MTM/Day figure was not an original goal of the
new MCS study, but it appears that this issue is now being readdressed within the
DOD. The methodology used for the new study is called “deterministic modeling”.
The study examines several different scenarios, which all have a baseline
requirement, and then models the options by adding additional airlift and sealift
capabilities. Thus far, preliminary data would appear to show that additional airlift
capacity in the early stages of a conflict will allow the U.S. earlier delivery of
cargo/personnel. Also, it would appear that additional sealift capacity later in a
conflict (e.g. sustainment phase) will help to avoid possible delivery shortfalls.12
Advanced Mobility Concepts Study (AMCS)
The Defense Planning Guidance (DPG) (2004-09) called for the Advanced
Mobility Concepts Study (AMCS) to ensure that DOD’s transformed forces would
continue to enjoy a strategic and operational mobility advantage over future
adversaries by accelerating the transformation of their mobility concepts and
capabilities. The Secretary of Army, in collaboration with the Chairman of the Joint
Chiefs of Staff (CJCS), the other Military Department Secretaries and the Combatant


10 John A. Tirpak, “The Airlift Gap,” Air Force Magazine, Oct. 2004, p. 34.
11 Ibid., p. 36.
12 This information was provided during in-person consultations with the Air Force Studies
and Analysis Agency on Feb. 9, 2005.

Commanders, led this comprehensive study to describe the future mobility concepts
and capabilities required for the 2015 - 2020 timeframe.13
The study considered several future mobility concepts and capabilities with
reference to Quadrennial Defense Review (QDR) 2001 transformational goals. In
particular, future mobility concepts were assessed against the QDR transformational
goal of “projecting and sustaining U.S. forces in distant anti-access or area-denial
environments and defeating anti-access and area-denial threats.”14 The study was
conducted in two phases. The first phase focused on future mobility platform
performance, cost, and risk. The second phase concentrated on performance only.
From an initial set of Service-nominated future mobility platforms, the AMCS
chose the most promising systems for evaluation. These strategic airlift and sealift
platforms included:
!Global Range Transport (GRT)
!Ultra-Large Airlifter (ULA)
!C-17 aircraft with a Payload/Range Expansion Program (PREP)
!Super Short Take Off and Landing (SSTOL) aircraft
!Shallow Draft High Speed Sealift (SDHSS)
!Fast Sealift Monohull
!Navy Vision Trimaran High Speed Sealift (NVTHSS)
!Navy Vision Surface Effect Ship High Speed Sealift (NVSESHSS)
The studies conclusions are discussed under the “Potential Strategic Mobility
Platforms” section of this report.
Institute of Defense Analyses Assessment of the AMCS
In June 2004, The Institute of Defense Analyses (IDA) completed a feasibility
analysis of the strategic sealift and airlift platforms examined in the AMCS Phase II.
This study is called the “Technical Capabilities Assessments of the Phase II
Advanced Mobility Concepts Study (AMCS) Concepts.” The assessment was
undertaken to:15
!Assess the near-term technical performance expectations and the
technical feasibility of achieving the capabilities assigned to the
concepts.
!Estimate longer term technical performance potential of the AMCS
II concepts based upon the identification of critical, enabling
technologies and their prospects for maturation.


13 U.S. Department of Army, Advanced Mobility Capability Study, Dec. 2003, p. iv.
14 U.S. Department of Army, Advanced Mobility Capability Study, Dec. 2003, p. iv.
15 James Fein et al., “Technical Capabilities Assessments of the Phase II Advanced Mobility
Concepts Study (AMCS) Concepts,” Institute for Defense Analyses (IDA), IDA Document
D-2996, June 2004, p. ES-2.

IDA used the following definitions for the Technology Readiness Levels
(TR Ls): 16
1 - Basic principles observed and reported
2 - Technology concept and/or application formulated
3 - Analytical and experimental critical function and/or characteristics proof of
concept
4 - Component and/or breadboard17 validation in laboratory environment
5 - Component and/or breadboard validation in relevant environment
6 - System/subsystem model or prototype
7 - System prototype demonstration in an operational environment
8 - Actual system completed and qualified through test and demonstration
9 - Actual system proven through successful mission operations
Defense Science Board -Strategic Mobility Task Force
The most recent Defense Science Board (DSB) report on strategic mobility was
released on August 31, 1996.18 The Task Force did a broad review of strategic
mobility including a range of scenarios. They considered Major Regional
Contingencies, Lesser Regional Contingencies, and Operations Other Than War.
Though the final report was completed almost nine years ago, there are several
findings that some observers have noted may still be pertinent today.19 The Task
Force concluded that mobility efforts should be focused on five major areas:20
!Shaping the force for rapid response — minimize the deployed
footprint ashore
!Improving the deployment architecture, planning, infrastructure and
flow
!Improving the information system support for deployment planning
and execution
!Improving the protection of the forces entering the theater
!Improving lift and prepositioning capabilities
For improving lift and prepositioning capabilities, the DSB mentioned the
importance of the strategic mobility lift triad, which consists of airlift, sealift, and
pre-positioned forces. It stressed that the needed lift and pre-positioning programs
will face multiple budget exercises, Congresses, and administrations and will need


16 James Fein et. al., op. cit., p. 9.
17 A “breadboard” is an experimental arrangement of electrical/mechanical components that
are mounted on a board to test feasibility.
18 Defense Science Board, Report of the Defense Science Board Task Force on Strategic
Mobility, Office of the Under Secretary of Defense for Acquisition and Technology,
Washington, Aug. 1996.
19 As a time reference, this report was completed after Desert Shield/Storm and the

1995 MRS-BURU, but before the 2003 Iraq War.


20 Defense Science Board, op. cit., pp. 12-14.

robust continuing support. The report also mentions: (1) the need to replace the Fast
Sealift Ships (FSS) starting around 2010, (2) that a worthy goal would be to replace
these FSS with a capability to deliver forces in one half the currently planned time
(e.g. commercial initiatives for ships with 50+ knot performance), and (3) the need
to track commercial development of very large lighter-than-air craft (e.g. 500 ton
capability). 21
The DSB report maintains one central theme throughout — the importance of
minimizing the U.S. footprint at the air and seaports of debarkation. This idea really
serves two purposes: (1) avoidance of backlogs at the Ports of Debarkation (PODs)
and (2) security of U.S. forces and material. First, the report mentions that more
emphasis needs to be put on minimizing the pile-up of forces and material at
vulnerable nodes. Those nodes are represented by the PODs. “From a strategic
mobility viewpoint, the most critical need is to reduce the day to day footprint at the
PODs.”22 Second, the report states that sea and air PODs are attractive targets since
there are likely to be bottlenecks where people and material pile-up. In the Gulf War,
96% of all sealift cargo went through two sea ports. For air cargo, 78% went through
five airfields. Many of these PODs will be within range of enemy weapon systems,
which can disrupt operations. In Operation Desert Shield/Storm, there was no attack
on the U.S. forces during the insertion and build-up of forces in theater. Future
adversaries may not be as accommodating. “Specifically, the hand-off of personnel,
equipment and material from USTRANSCOM (United States Transportation
Command) to the CINC (Commander-in-Chief) at the ports of debarkation appears
to be the “critical seam” where disruption of the deployment flow is most likely to
occur.”23 The Task Force emphasized the need to minimize the bottleneck of
exposed forces and material at vulnerable ports.
When looking at a typical ground force deployment, it is broken up into three
phases — fort-to-port, port-to-port, and port-to-foxhole. The problems mentioned
above are occurring in the port-to-foxhole phase. Many analysts believe that is where
our future strategic mobility platforms need to concentrate. The future of strategic
mobility could be to transport directly from fort-to-foxhole, or to at least plan for “port
denial” and to develop platforms that do not need to operate in these environments.
Another DSB mobility study is currently being conducted and is due to be
released in Spring 2005.
Strategic Mobility Inventories
United States Transportation Command (USTRANSCOM) manages all strategic
mobility assets. Air Mobility Command (AMC) and Military Sealift Command


21 Defense Science Board, op. cit., p. 82.
22 Ibid., p. 21.
23 Ibid., p. 36.

(MSC) are two of the three commands that make up USTRANSCOM.24 AMC is in
charge of the U.S. airlift assets and MSC is in charge of the U.S. sealift assets.
Strategic Airlift. As of March 8, 2005, AMC has 119 C-17s, 106 C-5s, and 2025
C-141s. Of the 119 C-17s, 111 are active duty AMC assets and 8 are Air National
Guard assets. Of the 106 C-5s, 57 are active duty AMC assets and 49 are Reserve26
assets. Of the 20 C-141s, all are Reserve assets (none in the active duty).
Congress has authorized and appropriated the production of 180 C-17s through
2008. U.S. Transportation command has been lobbying for 42 more C-17s, for a total
of 222 C-17s.
The C-17 has a maximum payload capacity of 170,900 pounds (18 pallet
positions) and an unrefueled range of approximately 2,400 nautical miles. It can
airdrop 102 paratroopers or it can carry large or heavy outsize cargo. It can takeoff
and land within 3,000 feet.27 It can travel at speeds up to 450 knots.28
The C-5 is one of the largest aircraft in the world. It can carry up to 270,000
pounds of outsize and oversize cargo (36 pallet positions) with a range of 2,150
nautical miles. It can takeoff fully loaded within 8,300 feet and land within 4,90029
feet. It can travel at speeds up to 450 knots.
The C-141 can carry either 200 troops, 155 paratroopers, 103 litters and 14 seats,
or 68,725 pounds of cargo (13 pallet positions). It has an unrefueled range of 2,174
nautical miles. It was designed to be able to takeoff within 8,000 feet and land within

4,000 feet. It can travel at speeds up to 434 knots (Mach .74)30


Strategic Sealift. Sealift and pre-positioned ships are two other parts of the
“strategic mobility lift triad.” As of February 1, 2005, MSC’s strategic sealift
inventory totaled 388 ships, of which 288 are classifies as Dry Cargo, 96 as Tankers,
and 4 as Passenger vessels. The Navy only owns/charters 120 of these ships. Of the
120 ships owned or chartered by the Navy, 82 are in the MSC Active Force and 38 are
in the Ready Reserve Force.


24 The third command in USTRANSCOM is the Surface Deployment and Distribution
Command (SDDC).
25 These numbers do not include the 11 C-17s and 8 C-5s that are in Air Education and
Training Command.
26 See CRS Report RS20915, Strategic Airlift Modernization: Background, Issues, and
Options, by Christopher Bolkcom, for more information on Strategic Airlift.
27 See CRS Report RL30685, Military Airlift: C-17 Aircraft Program, by Christopher
Bolkcom, for more information on the C-17.
28 Air Force Link - Fact Sheet: C-17 Globemaster III [http://www.af.mil/factsheet.asp?
fsID=86].
29 Air Force Link - Fact Sheet: C-5 Galaxy [http://www.af.mil/factsheet.asp?fsID=84].
30 Air Force Link - Fact Sheet: C-141 Starlifter [http://www.af.mil/factsheet.asp?fsID=93].

MSC operates a total of 36 pre-positioning ships.31 10 ships support the Army,
16 ships support the Marines, and the remaining 10 ships support the Navy, Defense
Logistics Agency, and the Air Force. Of the 120 Navy-owned ships, only 28 ships are
considered medium speed or higher. MSC owns 8 Fast Sealift Ships (FSS), which can
travel in excess of 30 knots, and 19 Large, Medium-Speed, Roll-on/Roll-off (LMSR)
ships, which can travel at speeds up to 24 knots. MSC also charters one High Speed
Vessel (HSV) for the III Marine Expeditionary Force as a prepositioning ship, which
can travel at speeds up to 33 knots.32
The Fast Sealift Ships are normally kept in “reduced operating status,” but can
fully activated and underway to loading ports within 96 hours. Together, all eight
ships can transport nearly the equivalent of a full Army mechanized division. These
ships can sail from the East Coast to Europe in less than six days and to the Persian
Gulf in 18 days. The FSS has a range of 12,200 nautical miles (at 27 knots) and can
carry approximately 200,000 square feet of cargo,33 the equivalent of about 200 C-17
payloads.
Of the 19 Large, Medium Speed, Roll-on/Roll-off ships, 2 are prepositioning
ships, 10 are in reduced operating status, and 7 are fully operational. The LMSR has
a cargo carrying capacity of more than 300,000 square feet (the equivalent of 400 C-

17 payloads), and a range of 12,000 nautical miles (at 24 knots).34


This HSV is a high speed roll-on/roll-
off catamaran chartered by MSC from
Austal Ships of Henderson, Australia. It
was originally chartered in January 2002 for
36 months, and has since been renewed. It
can carry 32,000 square feet of cargo
capacity and 970 passengers, and has a
range of 1,100 nautical miles (at 33
knots).35
Figure 1: HSV
Source: MSC Fact Sheet Library [http://www.msc.navy.mil/factsheet/]


31 See CRS Report RL32513, Navy-Marine Corps Amphibious and Maritime Prepositioning
Ship Programs: Background and Oversight Issues for Congress, by Ronald O’Rourke, for
more information on maritime prepositioning ships.
32 For more information on Military Sealift Command’s ship inventory, refer to the
following website: [http://www.msc.navy.mil/inventory/].
33 Norman Polmar, Samuel Loring Morison, Richard R. Burgess, The Naval Institute Guide
to the Ships and Aircraft of the U.S. Fleet, (Annapolis: Naval Institute Press, 2000), p. 288.
34 Norman Polmar, Samuel Loring Morison, Richard R. Burgess, op. cit., p.296.
35 For more information on the HSV, please refer to the following website:
[http://www.navs ource.org/ archives/09/774676.htm] .

Transformation Planning Guidance
When the George W. Bush Administration took office, a heavy emphasis was put
on transformation. The Office of Force Transformation (OFT) was created and
Transformation Planning Guidance (TPG) was published in April 2003. This
guidance defines the primary senior leaders’ roles and responsibilities for
implementing the transformation strategy. It states:
The Secretaries of the Military Departments and the Service Chiefs of Staff are
responsible for developing specific concepts for supporting operations and
core competencies. They will oversee Service experimentation, modify
supporting concepts accordingly, and build transformation roadmaps to
achieve transformational capabilities to enable those concepts.36
The Services and Joint Forces Command submit to OFT their transformational
roadmaps for approval no later than November 1 of each year. The 2004 roadmaps
were submitted to OFT in the late summer of 2004, however OFT’s review of these
roadmaps has not been completed to date.
The TPG also directs that an annual strategic appraisal will be written by the
Director of OFT and submitted to the Secretary of Defense no later than January 30
each year. The Strategic Transformation Appraisal evaluates and interprets the
progress of the transformation strategy, recommending modifications and revisions
where necessary.
The 2004 Strategic Transformation Appraisal included several “issues of regret,”
which outline key technologies that — if not explored — could be in the future
viewed as significant lost opportunities.37 Three “issues of regret” are pertinent to
strategic mobility:
!A “super” short-takeoff-and-vertical-landing mobility platform
!A heavy-lift vertical-takeoff-and-landing aircraft
!A shallow draft high-speed vessel with strategic range
Mobility Funding Trends
Table 1 illustrates the funding for airlift/sealift since FY2005, with projections
to FY2009.38


36 U.S. Department of Defense, Transformation Planning Guidance, Apr. 2003, p. 13.
37 Amy Butler, “Pentagon Transformation Analysis Outlines Military Capability Gaps,”
Defense Daily, Nov. 19, 2004, p. 1.
38 The “Airlift/Sealift” dollar figures are DOD Total Obligation Authority (TOA) numbers.
TOA is a DOD financial term which expresses the value of the direct program for a given
fiscal year (FY). It is based on the Congressionally approved budget authority (BA) for the
program, plus or minus financing and receipts or other adjustments.

Table 1. Mobility Funding Trends
Fiscal YearAirlift/Sealift% of Total
(millions)DOD TOA
200012,6604.03
200112,1233.86
200214,5993.93
200314,3403.81
200413,5873.57
200514,8573.80
200615,7483.93
200714,2353.46
200814,4713.44
200918,2704.25
Source: FY2004 National Defense Budget Estimates, Table 6-5.
The general trend for the next five years would appear to be relatively flat. Some
observers have questioned this flat trend, partly due to the Administration’s goal to
transform the DOD, of which strategic lift could be considered an integral part.
Potential Strategic Mobility Platforms
Sealift
There are three hull designs and two surface effect ship designs under active
consideration for new sealift capability. The potential platform designs are the
monohull (one hull), catamaran (two hull), trimaran (three hull), cavity catamaran
surface effect ship, and air cushion surface effect ship. In particular, these designs
were incorporated into the following potential strategic sealift platforms: the
Shallow-Draft High Speed Sealift, the Fast Sealift-Monohull, the Navy Vision
Trimaran High Speed Sealift, and the Navy Vision Surface Effect Ship High Speed
Sealift. This section will also briefly examine two intra-theater hull designs that may
be examined in the future.



Figure 2: SDHSS
Source: Institute of Defense Analyses
Shallow Draft High Speed Sealift (SDHSS). The SDHSS is intended to
be a strategic theater cargo vessel capable of 75 knots, with an intended range of 4,500
nautical miles. It would have a draft shallow enough to access ports not accessible to39
current sealift. It would carry 86,489 square feet of cargo (or 4,400 short tons), and

1,000 passengers simultaneously.40


The SDHSS is a “cavity catamaran,” with rigid catamaran-like sidehulls, and
about the last half of the ship having a carved out cavity. This cavitation reduces the
wetted surface of the hull and consequently lowers the hydrodynamic resistance. The
SDHSS would also use a self-generated air cushion to reduce hydrodynamic drag.41
Potential advantages of the SDHSS include:42
!With a speed of 75 knots, the SDHSS would be nearly three times
faster than the current Large, Medium Speed, Roll-on/Roll-off sealift
vessel.
!With a shallow draft, the SDHSS could deliver cargo and personnel
without having to rely on a deep-water port. This could help
minimize the footprint at a deep-water port, thereby increasing the
number of possible entry points into a theater of operation.


39 “Draft” is the depth of water a ship draws especially when loaded.
40 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-6.
41 V.A. Dubrovsky and K. I. Matveev, “Some Aspects of the Growth in Speed of Fast
Combat Ships,” International Journal of Maritime Engineering, Royal Institution of Naval
Architects, 2004, p. 3. [[http://www.rina.org.uk/rfiles/IJME/sky.pdf]].
42 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-7.

Potential disadvantages of the SDHSS include:43
!The size of the SDHSS could prevent it from entering many coastal
and/or riverine ports, as well as the Panama Canal.
!Its performance may be limited in poor weather and high sea states.
Some of the current issues with the SDHSS are as follows:44
!A speed of 75 knots may not be practical. There may be a
detrimental effect on passengers in the open ocean. Further open
ocean study is needed.
!Some sealift experts and engineers do not think it is feasible to
produce a ship with this design. Experts believe that the speed,
payload, and range of this vessel would be difficult to achieve.
Technological feasibility has not been proven.
!A more aggressive High Speed Sealift Research and Development
program would be required to produce a SDHSS that can meet these
design parameters. The High Speed Sealift Innovation Cell, a joint
effort funded by the Navy and OSD, published a Technical
Development Plan that identified $1.2 billion in R&D efforts for the
SDHSS, with the preponderance of the effort going to gas turbine
research ($700 million).
As mentioned earlier in the report, the Institute of Defense Analyses (IDA)
completed a feasibility analysis of the strategic airlift and sealift platforms examined
in the AMCS Phase II. The analysis of the SDHSS highlighted a couple of issues:
!“No near-term performance above 40 knots is feasible. The issues of
drag, propulsive power, and dynamic stability in waves are unknowns
today. ”45
!“In the far term, feasibility is possible with significant investment in
critical technologies. However, the issues of installing sufficient
power into a hull, designing an integrated propulsion system,
reducing drag, and controlling dangerous motions and accelerations
must be addressed.”46


43 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-7.
44 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-8.
45 James Fein et al., Technical Capabilities Assessments of the Phase II Advanced Mobility
Concepts Study (AMCS) Concepts, Institute for Defense Analyses (IDA), IDA Document
D-2996, June 2004, p. 58.
46 James Fein et al., op. cit., p. 58.

!Because of these concerns, IDA felt the SDHSS was “Marginally
Feasible”47 in the “Far Term” (FY2016), but with oriented technology
investment.48
Figure 3: Fast Sealift - Monohull
Source: Institute of Defense Analyses
Fast Sealift - Monohull. The Fast Sealift - Monohull is a semi-planing
monohull. The inter-theater vessel would be capable of transporting 8,000 short tons
or 158,000 square feet of cargo, traveling at speeds up to 38 knots, with a range of
6,000 nautical miles. It is a commercially designed platform, but with some
modifications the ship could move military cargo.49
The Monohull design exploits a unique deep, V-shaped bow hull design to create
lift at the stern, which coupled with water jet propulsion would allow it to carry heavy
loads with great stability at high speeds.
Potential advantages of the Monohull include:50
!Given that the Monohull is being developed for commercial
application, the technology could be leveraged for military needs
with little cost to the DOD.
!With only 12’ of stern draft, the Monohull may offer access to
shallow draft ports with very steep beach gradients (at least 10%),
when “med-moored.”51
!With 38 knots of speed, it is faster than any current strategic sealift.


47 Feasibility assessments are based upon judgements that technology capabilities can be
achieved with no more than medium risk. Marginally feasible indicates that the assessed
performance “nearly meets” the AMCS performance in the judgement of the (IDA) analyst
and/or may be feasible but at high risk.
48 James Fein et al., op. cit., p. ES-3.
49 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-16.
50 Ibid.
51 “Med-mooring” is defined as a ship that unloads its cargo directly out of the stern (or
back) of the ship. Traditionally, ships off-load their cargo while parallel to the shore or pier.
The Monohull would off-load its cargo while perpendicular to the shore or pier.

Some of the drawbacks of the Monohull are as follows:52
!There are no passenger accommodations. This would affect enroute
mission planning and arrival into an operating area ready to fight.
NAVSEA is examining the capability to transport passengers using
modules, which would be used at the expense of cargo.
!The loaded maximum draft of 35 feet limits access to a number of
ports.
!The Monohull has unique load/unload requirements that could limit
port access.
When IDA examined the Monohull, it had the following issues:53
!Drag. Monohulls have high drag that is caused by frictional drag and
wave drag. It is thought that the semi-planing form will reduce drag,
but not eliminate it.
!Due to a slender high-speed hullform, there may be a roll stability
issue.
!Rough water performance is an issue. Roll and pitch fins may be
required, but will also increase the drag.
IDA categorized the Monohull as “Marginally Feasible” in the “Near Term”
(FY2006) and “Far Term” (FY2016), without oriented technology investment. It also
categorized it as “Feasible” in the “Far Term” (FY2016), but with oriented technology
investment.54
Figure 4: NVTHSS


Source: Naval Sea Systems Command
52 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-17.
53 James Fein et al., Technical Capabilities Assessments of the Phase II Advanced Mobility
Concepts Study (AMCS) Concepts, Institute for Defense Analyses (IDA), IDA Document
D-2996, June 2004, p. 47.
54 Ibid., p. ES-3.

Navy Vision Trimaran High Speed Sealift (NVTHSS). The NVTHSS
would be 1,060 feet in length and have a beam of 129 feet. It would have a 28-foot
draft and a range of 8,700 nautical miles. It would transport 4,500 short tons or
88,500 square feet of cargo, while simultaneously carrying 1,000 passengers. If no
passengers are carried, it can transport an additional 32,599 square feet of cargo or 500
short tons. It would be designed to have a cruise speed of 55 knots. The Trimaran
design is a slender monohull with two side hulls for added stability. The slender form
allows reduced drag and greater speed than conventional sealift.55
Potential advantages of the NVTHSS include
!It could deliver cargo/personnel at much higher speeds than current
sealift.
!Its shallow draft could decrease dependency on major ports and
provide alternatives when adversaries deny access to major sea ports.
Potential disadvantages of the NVTHSS include:
!The NVTHSS’s width could prevent transit through the Panama
Canal, and the length may restrict access to smaller ports.
!The cargo capacity is less than current sealift (the LMSR can carry

300,000 square feet of cargo).56


The Army’s AMCS and the IDA study noted the following issues:57
!A limited number of shipyards are capable of building this ship owing
to its length. The ship is similar in length to an aircraft carrier, and
longer than any current sealift ship.
!Further study may be required for passenger transport due to the lift
support requirements.
!A speed of 55 knots may not be feasible due to passenger comfort.
Further study may be required on the high speed effect on passengers
in the open ocean.
!As with the SDHSS, hydrodynamic drag, propulsion, and speed
effects are unknown and result in an assessment of “Marginally
Feasible” in the “Far Term” (FY2016).58
If the speed requirement was decreased to 40 knots (or less), the IDA analysts
thought that this design would be feasible in the near term (FY2006).


55 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-20.
56 Ibid.
57 Ibid.
58 James Fein et al, Technical Capabilities Assessments of the Phase II Advanced Mobility
Concepts Study (AMCS) Concepts, Institute for Defense Analyses (IDA), IDA Document
D-2996, June 2004, pp. 50 and ES-3.

Navy Vision Surface Effects Ship High Speed Sealift.The Navy
Vision Surface Effects Ship High
Speed Sealift (NVSESHSS) would
have a length of 944 feet and a beam
of 195 feet. It would have a variable
draft of 9.8’ to 24.7’. It has a design
range of 8,700 nautical miles and be
able to transport 97,700 square feet of
cargo or 4,500 short tons, when
configured for 1,000 passengers. If
not configured for passenger carry,
the ship could carry an additional
Figure 5: NVSESHSS32,500 square feet of cargo or 500
short tons. It would have a cruise59
speed of 60 knots.
Source: Naval Surface Warfare Center - Carderock Division
The Surface Effects Ship also has rigid catamaran-like sidehulls and uses bow
and stern seals to create a plenum (or air-filled space) that is pressurized. The result
is a ship that is 80% supported by air and 20% by buoyancy. When the plenum is
pressurized (on cushion), the wetted surface of the sidehulls is reduced, hence60
reducing drag and allowing high speeds.
Potential advantages of the NVSESHSS 61 include
!The NVSESHSS could travel almost three times faster in open water
than the Large, Medium Speed, Roll-on/Roll-off ship, but with only
a third of the cargo capacity and 3/4 of the range.
!With the cushion option, it can use shallow, austere seaports,
decreasing dependency on major ports, and increase access
alternatives when adversaries deny major sea ports.
Potential disadvantages of the NVSESHSS include
!Due to the ship’s length and width, the ship may have limited access
to small coastal and riverine ports, as well as the Panama Canal.
!Due to the ship’s length and beam, there will be a limited number of
ship building yards capable of building the NVSESHSS.


59 U.S. Department of Army, Advanced Mobility Concepts Study, Dec.2003, pp. 4-21.
60 For more information on high speed sealift, please refer to the following website:
[http://www.gl obalsecurity.org/ military/systems/ship/hss.htm] .
61 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-21.

One of the current issues with the NVSESHSS is as follows:62
!Even if 60 knots of speed is possible, the detrimental effects on the
passengers may need to be evaluated in an open ocean study.
When IDA examined the NVSESHSS, it had the following issues:63
!Speed in excess of 40 knots is not feasible in the near term.
!For the far-term, the Surface Effect Ship (SES) has a distinct
disadvantage at lower speeds. The cost of the cushion lift far
outweighs any reduced drag. The speed of the SES should only be
considered at speeds of 55 knots or higher.
!In the far term, this design is possible with significant investment in
critical technologies. The issues of installing sufficient power,
designing an integrated propulsion system, reducing drag, and
controlling dangerous motions and accelerations must still be
addressed.
For the NVSESHSS, IDA categorized it as “Marginally Feasible” in the “Far
Term” (FY2016), but with oriented technology investments.64
Intra-theater Designs with Potential Strategic Applications. There are
two additional ship designs that could possibly be used for strategic lift. They are the
high speed catamaran and a “hybrid lifting body ship” that combines the high speed
capabilities of a hydrofoil and the rough water stability of a small waterplane area twin
hull (SWATH). Currently, these designs pertain to intra-theater vessels, but future
technologies may allow this design to be applied to inter-theater vessels.
High speed catamarans are already commercially available, but are primarily used
for the intra-theater role. The Australian Navy’s HMAS Jervis Bay is an example of
this type of technology. It can transport up to 500 troops, with their vehicles and
equipment, up to a range of 1,000 nautical miles, at speeds of more than 40 knots.
The U.S. Navy and Army are currently chartering catamarans from two65
Australian companies, INCAT and Austal. The Navy’s Military Sealift Command
(MSC) is chartering the Westpac Express (manufactured by Austal) for the III Marine
Expeditionary Force. MSC is also chartering another high speed catamaran to
support U.S. Navy Mine Warfare Command, the High Speed Vessel (HSV) 2 Swift
(manufactured by INCAT).


62 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-22.
63 James Fein et al., Technical Capabilities Assessments of the Phase II Advanced Mobility
Concepts Study (AMCS) Concepts, Institute for Defense Analyses (IDA), IDA Document
D-2996, June 2004, p. 54.
64 Ibid, p. ES-3.
65 For more information on INCAT’s Catamaran ships, please refer to the following website:
[ h t t p : / / www.i n c a t .c om.a u/ de f e nc e . c gi ? t a s k= HSV ] .

The Army’s Tank Automotive and Armament Command is also leasing two
catamarans. The two catamarans are the Joint Venture HSV-X1 and the Theater
Support Vessel (TSV) - 1X (both manufactured by INCAT).66 The Army is using
these vessels to demonstrate the range of capabilities that a similarly designed fleet
would provide the joint force commander. The TSV is part of the Army’s
transformation plans. The Army believes that the TSV will greatly enhance intra-
theater deployment and logistics support for its units worldwide.67
International Catamaran has conducted studies on catamarans with design goals
of 3,000 tons of cargo, 50 knots of speed, and a range of 3,000 nautical miles. “In the
future, a vessel with 5,000 - 10,000 tons of cargo capability at 40 knots with a range
of 35,000 nautical miles may be feasible.”68
The Navy believes that another future technology could be the “hybrid lifting
body ship.” The hybrid lifting body ship is a catamaran-like ship with a mid-hull foil
and an aft foil with twin propellers. As the ship picks up speed, the hull comes
completely out of the water, carried by the wing-like foils. This reduces drag and
wave action, thus giving it a smoother ride at faster speeds in rougher seas. Currently,
Navatek Ships, a Hawaii-based firm, is testing this technology on the Sea Flyer. Sea
Flyer is a 160-foot, 340-ton craft designed in the 1980s as an experimental patrol and
support ship. It was mothballed until the Navy donated it to Navatek. In April 2001,
Navatek was awarded a $6.3 million Navy contract to demonstrate and evaluate lifting
body technology for future hull designs. After modifications, the Sea Flyer can travel
at a maximum speed of 30+ knots with a draft of 18.5 feet. Steven Loui, Navatek’s
president, said: “The goal has been to get the technology that gives us the speed and
efficiency of the hydrofoil with the comfort of a SWATH ship.”69 He went on to say
that Navatek would like to extend this technology to war ships, but also noted that
there is a lot skepticism that this technology can be scaled to the 2,000 to 5,000-ton
ship range.
Airlift
A number of potential strategic airlift platforms are under consideration, these
include the Global Range Transport (GRT), the Super-Short, Take-off and Landing
(SSTOL) aircraft, spiral development of the C-17 - Payload/Range Expansion
Program (PREP), the Ultra-Large Airlifter (ULA), Unmanned Aerial Vehicles
(UAVs), the Wing-in-Ground Effect (WIG) Aircraft, and seaplanes.


66 For more on the HSV-X1, the TSV-1X, the HSV 2 Swift, and the WestPac Express, see
[http://www.gl obalsecurity.org/ military/systems/ship/hsv.htm] .
67 For more information on the Army’s TSV plans, see [http://www.ausa.org/PDFdocs/
tsv.pdf].
68 “High Speed Sealift,” GlobalSecurity.org, [http://www.globalsecurity.org/military/
systems/ship/hss.htm] .
69 Gidget Fuentes, “Sea Flyer Challenges Rough Waters: Unique Design Boosts Speed,
Wave Stability,” Defense News, Oct. 11, 2004, p. 26.

Figure 6: Global Range Transport


Source: Boeing Frontiers, April 2004
Global Range Transport (GRT). The GRT would be a blended wing body
(BWB) aircraft potentially capable of carrying 459,000 pounds with a range of 3,860
nautical miles, or 157,150 pounds of payload with a range of 10,841 nautical miles.
It would carry 584 passengers and travel at 489 knots.
If built, it would be the largest aircraft ever designed and flown. It would have
a maximum takeoff weight of 1,357,000 pounds. In contrast, the C-5, which is
currently the largest U.S. military aircraft, has a maximum takeoff weight of 840,000
pounds.70
The GRT is currently one of the notional examples for Air Mobility Command’s
next generation of airlifters. The next generation airlifter has been dubbed the
Advanced Mobility Concept, or AMC-X.71
Potential advantages of the GRT include
!The ability to move large amounts of cargo/passengers over long
distances. The GRT could transport 2.5 times more cargo than the C-
5, but would be approximately the same size as the C-5. This would
make for more efficient use of the limited amount of ramp space
available at the airports.72
!If the military desires this capability, the technology has applicability
across a number of missions such as Intelligence, Surveillance, and
Reconnaissance, Tanker/Transport and Bomber.
One of the potential disadvantages of the GRT may be that it will require at least
a 7,000 foot runway at a fixed aerial port.
70 James Fein et al., op. cit., p. 17.
71 John A. Tirpak, ed., “New Transports Taking Shape,” Washington Watch, Oct. 2004, Vol.

87, No. 10, p. 5.


72 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-18.

Some of the current issues with the GRT are as follows:73
!There is a limited commercial interest in this concept. Almost all
funding for the GRT would have to be by the government, since
industry does not appear to be heading in this direction. The
government could seek agreement to recoup the RDT&E cost if there
is an industry demand.
!There is a technological challenge for a BWB due to manufacturing
techniques. This challenge could possibly be mitigated by leveraging
the existing work on the B-2 stealth bomber.
When IDA examined the GRT, it documented several issues/challenges:
!One area of concern was the key technologies needed to make this
design feasible. IDA mentions weight, propulsion, and the Lift/Drag
(L/D) ratio.
!Another area of concern is aerodynamics, in particular the pitching
moment.74 BWBs have no tail to balance the large pitching-moment
i n creases. 75
IDA’s analysis states that the GRT is “Marginally Feasible” in the “Far Term”
(FY2016), but “Feasible” in the “Far Term” (FY2016), but with oriented technology
investment.76
Figure 7: SSTOL Aircraft


Source: Boeing Frontiers, February 2003
73 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-18.
74 A pitching moment determines how much an aircraft’s nose will pitch up or pitch down
of its own accord.
75 James Fein et al, “Technical Capabilities Assessments of the Phase II Advanced Mobility
Concepts Study (AMCS) Concepts,” Institute for Defense Analyses (IDA), IDA Document
D-2996, June 2004, pp. 18-19.
76 Ibid., p. ES-3.

Super Short Take-Off and Landing (SSTOL) Aircraft. The SSTOL
aircraft is designed as a tilt-wing, no-tail, turbo-prop aircraft capable of taking off and
landing in just 1,000 feet of runway. It would be able to carry 72,000 pounds of
outsize or oversize cargo, or 80 passengers, or a mix of the two. It is designed to have77
a cruise speed of 380 knots and a range of 3,100 nautical miles.
The SSTOL aircraft is intended to be big enough to deliver the Army’s Future
Combat System (FCS) vehicles directly to the forward area. The cargo capacity could
be 50 - 100 percent greater than the C-130, the current primary transport aircraft.
Potential advantages of the SSTOL aircraft include:78
!By landing in just 1,000 feet, the SSTOL aircraft frees up the limited
amount of ramp space available at aerial ports.
!By delivering forces/equipment directly to the battlefield, it
minimizes the footprint at the Aerial Ports of Debarkation (APODs).
!In contrast to the C-130, the SSTOL will be able to carry oversize and
outsize cargo. Currently, only the C-5 can carry oversize and outsize
cargo.
Two potentially constraining factors for SSTOL development are cost and
unproven technology.79 Since there is limited commercial use for this aircraft, DOD
would have to provide all research and development funding. The wing and flight
controls for the “no-tail” design pose a significant technological challenge.
Leveraging the work done on the Osprey may mitigate risk for the tilt wing.
Leveraging the work done on the B-2 bomber plus teaming with the GRT may
mitigate risk for the flight controls.
IDA’s analysis states that the SSTOL aircraft is “Marginally Feasible” in the “Far
Term” (FY2016), but “Feasible” in the “Far Term” (FY2016), with oriented80
technology investment.
C-17 Spiral Development (Payload & Range Expansion Program).
The C-17 Spiral Development Payload and Range Expansion Program (PREP) is a
long-range plan to modernize the C-17 aircraft. The PREP will increase the aircraft’s
payload and extend its range. The intent is to increase the average payload from 45
short tons (90,000 pounds) to 49 short tons (98,000 pounds) and change the maximum
range from 4,600 nautical miles to 6,300 nautical miles.81


77 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-13.
78 Ibid.
79 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-14.
80 James Fein et al, op. cit., p. ES-3.
81 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-19.

A potential advantage of the C-17 PREP includes:
!The PREP seeks to allow more flexibility to support strategic and
tactical missions by eliminating enroute stops and allowing direct
delivery of forces, thereby reducing deployment times.82
Potential disadvantages of the C-17 PREP include:83
!It may not be possible to take advantage of PREP on all missions.
The aircraft could run out of floor space before it actually exceeds
aircraft weight limits.
!When the C-17 lands on “soft fields,” it may not be able to take
advantage of the increased gross weight capacity.
The IDA study states that three modifications would be needed to achieve the
desired range and cargo capacity increases. First, the fuselage would need to be
strengthened and extended to allow more payload, troops, and fuel to be carried.
Second, the C-17 would need a more efficient wing so as to be able to handle the
increased weight. Third, the C-17 would need engines with a lower specific fuel
consumption (SFC).84
In summary, the IDA study thought the C-17 PREP was “Marginally Feasible”
in the “Near Term” (FY2006) and “Far Term” (FY2016), and “Feasible” in the “Far
Term” (FY2016), with oriented technology investment.85
Ultra-Large Airlifters (ULA). There are two ULA designs that this report will
examine — the Vertical Take off and Land (VTOL) Crane variant and the
Conventional Take Off and Land (CTOL) variant.86 Both are commonly characterized
as lighter-than-air aircraft.
The VTOL Crane variant is based on a
conventional ellipsoidal airship that uses a crane to
lower/raise the payload bay. It is nominally a
vertical takeoff and land vehicle. The VTOL
Crane uses static lift (buoyancy) to stay aloft. The
VTOL Crane variant had a design goal of 176
short tons.
Source: Office of Force Transformation


Figure 8: VTOL Crane
82 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-19.
83 Ibid., pp. 4-19 - 4-20.
84 James Fein et al., op. cit. p. 23.
85 Ibid., p. ES-3.
86 See CRS Report RS21886, Potential Use of Airships and Aerostats, by Christopher
Bolkcom, for more information on lighter-than-air (LTA) platforms.

The CTOL variant, also called a hybrid lifting body airship, combines static lift
(buoyancy) with aerodynamic lift. The aerodynamic lift is intended to allow a ship of
the same size as an ellipsoidal airship to have greater lift and thus carry more cargo.
The hybrid shape should also allow for a higher cruising speed for the same power.
The hybrid airship may require a takeoff
run that will exceed 10,000 feet in some
cases. An unimproved field or water may
be used for the takeoff run, but it must be
relatively flat. The field must also be clear
of trees, power lines, and other obstacles.
The CTOL variant had a design goal of 500
short tons.
Figure 9: CTOL VariantSource: [http://www.globalsecurity.org/military/systems/aircraft/skycat.htm].
The Advanced Mobility Capability Study (AMCS) examined a “blended” (or
combined) variant of the CTOL and the VTOL Crane ULAs. The “blended” ULA had
a design goal of 338 short tons at a speed of 76 knots for a range of 5,600 nautical87
miles. AMCS participants believed this type of modeling “provided a solid,
measurable means to apply professional judgment and compare various platforms.”88
Potential advantages for the ULA included:89
!Could bypass the traditional ports (APODs and SPODs) to mitigate
an enemy’s access denial strategies.
!Designed to offload cargo in flat open areas, thus possibly delivering
cargo direct to the battlespace.
!Hybrid advocates have proposed that the CTOL variant could land
on, and operate from, bodies of water (rivers or bays).
!Proposed cargo capacity could be approximately three to eight times
the tonnage capacity of a C-5 (C-5 planning factor is 61.3 short tons).
!Testing by the manufacturer on Lighter-Than-Air vehicles showed
limited radar signature and significant survivability to direct fire.
Potential disadvantages of the ULA include:90
!At 76 knots, it is roughly 1/5 the speed of a C-5/C-17, though it can91


maintain this speed for 24 hours per day for multiple days.
87 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-8.
88 Michael Woodgerd, LTC, USA, Center for Army Analysis, interview by author,
Washington, Feb. 15, 2005.
89 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, pp. 4-9.
90 Ibid.
91 Michael Woodgerd, LTC, USA, Center for Army Analysis, interview by author,
(continued...)

!The maximum projected altitude for the ULA is 6,000 feet. This
altitude will limit access and transition in higher mountain areas of
the world.
!The “blended” variant carried 76 passengers to simulate support
personnel for carried equipment. More passengers could be carried
at the expense of cargo. If passengers are carried, life support and
safety requirements would need to be further examined, as well as
human factors for long duration flights.
!If airports are used, ULA arrivals and departures could limit or
shutdown aircraft operations, effect airflow, and decrease throughput.
AMCS analysts have stated the following as issues for the ULA:92
!Ballast. Both variants of the airships need ballast to keep themselves
within weight limits. As cargo is offloaded, either ballast must be
added or helium must be vented into the air. The most common type
of ballast is water. In an austere environment, it may be difficult to
find water or other material that can be used as ballast.
!Offload. For the prototype variant of the ULA, the “offload” and
“expedited offload” times of 6 and 5 hours, respectively, may be
somewhat optimistic.
!Landing Zones. The CTOL variant of the ULA requires a large
landing zone. Due to this fact, the number of ULAs in one area may
be limited. It is estimated that the largest potential landing zone
would be the equivalent of 109 football fields. The VTOL variant
would require significantly less space, approximately three football
fields.
One of the strengths of the ULA is its advertised capability to operate from
unimproved landing sites. Critics of the ULA’s CTOL variant often mention the
landing zone or footprint requirement needed for it to operate. As a minimum, it
would appear that at least 3,500 feet would be required for the CTOL variant to land.
In an 80,000 square mile survey across the planet, Boeing analysis found that on
average only 1% of this area allowed a feasible landing zone of approximately 3,500
feet or longer. On the other hand, it was found that almost 50% of this area allowed
a feasible landing zone of 1,000 feet. This data would appear to give more credence
to the VTOL crane variant, which proponents have said would require a landing zone
of approximately 1,000 feet.


91 (...continued)
Washington, Feb.15, 2005.
92 Advanced Mobility Concepts Study, Department of Defense, Dec. 2003, pp. 4-10.

The IDA study only examined the CTOL variant, but some of its conclusions and
technical issues may pertain to both variants. The study mentioned the following
ULA issues:93
!The airships size will be limited by the strength of the available
fabrics, joining methods, and facilities. Research needs to be done in
fibers, yarns, weaves, and bonding technology.94 Even if seaming for
large airships is feasible, faster seaming machines will need to be
developed that can seam thick fabrics. For final vehicle assembly and
envelope fabrication, a covered expanse, similar in size to a football
stadium, will be needed.
!Further study of the aerodynamics of the lifting body is required near
the ground and in free air.
!Further study of ballast is required to offset fuel expenditure and
discharge of cargo.
!IDA recommended that the design be done in steps. First, design a
30-ton introductory version, then move to larger capacity craft as the
design matures.95
The IDA study stated that the ULA was “Infeasible” in the Near Term (FY2006),
“Marginally Feasible” in the Far Term (FY2016), and “Feasible” in the Far Term
(FY2016) with oriented technology investment.96
Advocates for the ULA feel that the VTOL Crane variant with approximately 200
short tons of capacity is feasible today with current technology.97
Unmanned Aerial Vehicles (UAVs). In 2001, Northrop Grumman’s Global
Hawk flew 7,500 nautical miles nonstop from the U.S. West Coast to Australia. It had
no pilot in the cockpit or on the ground to remotely guide it. It was a totally


93 James Fein et al., Technical Capabilities Assessments of the Phase II Advanced Mobility
Concepts Study (AMCS) Concepts, Institute for Defense Analyses (IDA), IDA Document
D-2996, June 2004, pp. 31-33.
94 With current fabric technology, a fabric of three plies would allow an envelope volume
of 5.3 million cubic feet. To reach a capability similar to that of the “prototype” variant
(338 tons), an envelope volume of at least 24.4 million cubic feet would be needed, or a
fabric that is about 5 times as strong as current fabrics.
95 DARPA is funding research on the WALRUS program. The program is a design and
development effort where the primary objective is to demonstrate the feasibility and
viability of a large airship to transport a Unit of Action from ‘Fort to Fight.’ The ultimate
goal is for the WALRUS to be able to lift 500 tons or more across intercontinental distances
and that it will be capable of operating from unimproved landing sites.
96 James Fein et al., op. cit., p. ES-3.
97 Michael Woodgerd, LTC, USA, Center for Army Analysis, interview by author,
Washington, Feb. 15, 2005.

computer-controlled, automatic flight. The UAV took off, performed a tight spiral
climb to the cruise altitude of 65,000 feet, traveled enroute at more than 350 knots,
performed a steep, spiral descent, and then executed a fully automatic landing to a full
stop.
Some proponents of the UAV maintain that this mission proves that the
technology exists to manufacture a UAV cargo-only transport. Though the technology
may exist, there currently does not appear to be any immediate plans to develop such
a UAV. Upon reviewing the DOD’s Roadmap for developing and employing UAVs
through the year 2027, it does not show any introduction of a UAV cargo transport
until the 2025 - 2030 timeframe.98
The DOD Roadmap does state that there are many advantages offered by UAVs
to military commanders, most notably in the mission areas categorized as “the dull,
the dirty, and the dangerous.” For now, this seems to be the DOD’s focus. For
example, it mentions that one UAV with multiple sensors could survey the same area
as ten or more human sentries (“the dull”). UAVs could survey areas contaminated
with chemical, biological, or radiological agents without risk to human life (“the
dirty”). Also, UAVs could perform the duty of suppression of enemy air defenses
(SEAD) that F-16s and EA-6s currently perform (“the dangerous”), with less need for
supporting aircraft.99 The next DOD Roadmap is due for release in Spring 2005.
If 2025 is indeed a target for a UAV cargo transport, then this timeframe is only
20 years away. If the development spans for current weapon systems are any indicator
(e.g. the F/A-22 started development in 1986), then some observers have noted that
now may be the time to examine the UAV cargo transport. The first hurdle commonly
mentioned is access to the National Airspace System (NAS). In particular, if a UAV
cargo transport is to fly, it would most likely need access to the 18,000 feet to 40,000
feet flight levels. To operate freely in the NAS, UAVs are going to be expected to
operate identically to manned aircraft. An air traffic controller should not even know
whether or not an aircraft is manned.
A thorough UAV assessment was undertaken by a combined Joint Aviation
Authority/Eurocontrol UAV Task Force over a 18-month period during 2003 - 2004.
The critical yardstick that the task force used in assessing UAV operations was
whether they met an equivalent level of safety, compared with conventionally
manned aircraft. In discussing airworthiness, therefore, the report stated that
a civil certificate of airworthiness (or its military equivalent) would be
mandatory to enter civil controlled airspace.100
This would mean that UAV cargo transports intended to be operated in the NAS
would have to be built in certified aircraft manufacturing plants, that they would have
to use approved aeronautical standards and materials, be subject to all aviation


98 U.S. Department of Defense, UAV Roadmap 2002, p. 58.
99 U.S. Department of Defense, UAV Roadmap 2002, p. iv.
100 William Reynish, “UAVs Entering the NAS,” Aviation Today, Feb.10, 2005.

inspection processes and procedures, and pass rigorous flight test certification. The
UAVs would be also subject to an approved maintenance program, which would have
to be performed by licensed personnel in airframe, engines, electronics, etc.
For a transport UAV to fly in the NAS, it would be expected to file and fly
Instrument Flight Rule (IFR) flight plans . . . just like manned flights. The airlift
UAV will most likely need to rely on a variety of communication, navigation, and
surveillance (CNS) technologies to safely and efficiently operate in civil airspace.
Some analysts have noted that current manned cargo transports already rely heavily
on automation in all areas of flight, to include take-off, cruise, and landing. As long
as the UAV cargo transport is equipped with the normal avionics associated with
manned flight, then the navigation and surveillance technologies would not appear to
present any significant challenges. Equipment such as an onboard Traffic Alert
Collision Avoidance System (TCAS), inertial navigation and global positioning
systems (INS and GPS), real-time weather avoidance radars, Automated Dependent
Surveillance - Broadcast (ADS-B), Traffic Information Service (TIS), a flight control
guidance system, an Enhanced Ground Proximity Warning System (EGPWS), and
non-cooperative sensors are some of the systems that may be required. These are
essential for the safe, secure, and reliable integration of the UAV into the NAS.
UAV CNS issues were recently examined at the 2004 NASA Integrated CNS
Conference and Workshop held from April 26 - 30, 2004.101 The one area this
conference highlighted throughout was the area of communication. There are two
communication links required for remotely piloted UAV operations: (1) the interface
between the UAV pilot and Air Traffic Control; (2) the interface between the UAV
pilot and the aerial vehicle. Both of these have a need for Line of Sight (LOS) and
Beyond LOS capability. The specific challenges for this type of communication are:
!Latency - how much of a delay is acceptable?
!Security - prevention of unauthorized seizure of UAV and to ensure
protection from jamming/spoofing/sabotage.
!Availability/Reliability - a lost link problem.
!Link Quality - the need to provide sufficient voice quality and limited
data degradation.
!Sufficient Bandwidth - potential for saturation of available bandwidth
in a given geographical area.
These issues will need to be addressed if the future UAV cargo transport is
remotely piloted. But what if the UAV is not remotely piloted? The other alternative
may be a totally computer-controlled, automatic flight such as the Global Hawk.102
To develop this type of UAV, observers commonly mention a couple of options.
One, the DOD could develop a brand new UAV cargo transport. At a minimum, the


101 John S. Walker, Enabling America’s Next Generation of Aviation Vehicles, briefing
given at 2004 NASA ICNS Conference & Workshop, April 26-30, 2004.
[http://spacecom.gr c.nasa.gov/icnsconf/2004/agenda.shtml ].
102 See CRS Report RL31872, Unmanned Aerial Vehicles: Background and Issues for
Congress, by Christopher Bolkcom, for more information on UAVs.

typical development span is about 12 years. Another idea that some analysts have
mentioned is to modify existing aircraft.
Though no UAV cargo transports are currently being developed by the DOD,
there does appear to be commercial interest in the idea. “Don Barber, senior vice
president at FedEx, told ATCA (Air Traffic Controllers Association) attendees he
believes that, though unmanned air freighters “may not be ubiquitous soon,” UAV
cargo transport “will be a demonstrated reality” in the near future.”103 For the air
freight industry, two of the biggest expenses are fuel and pilot salaries. If the pilot
could be removed, significant savings may be achieved. Though this type of
technology could possibly be utilized in the airline industry, many analysts have stated
that it will be some time before passengers will permit the removal of the pilot from
the cockpit.
Wing-In-Ground Effect Aircraft. The wing-in ground effect (WIG) aircraft
is designed as a long-range, transoceanic transport. It is intended to fly as low as 20
feet above the sea and take advantage of an
aerodynamic phenomenon called ground
effect that reduces drag and fuel burn. The
aircraft’s size and efficiency could allow it to
carry the equivalent of current day cargo
container ships, but at ten times the speed. It
is intended to be capable of flying at the
same speed and altitude as most turboprop
aircraft — 300 mph and up to 20,000 feet,
but most of its flight pattern it will be
hugging the water’s surface and taking
Figure 10: WIG Aircraftadvantage of the ground effect. The WIG
would be designed for a range of 10,000
nautical miles over the water.
Source: Boeing Phantom Works
The WIG aircraft would be 400 feet long, have a wing span of 500 feet, and be
powered by four pairs of 80,000-hp turbine engines. If built, it would be the largest
aircraft ever flown. Designs indicate it would weigh 3.2 million pounds, with a
potential to carry 2.8 million pounds of cargo. It would carry the same amount of
cargo as a Large, Medium Speed Roll-on/Roll-off ship at ten times the speed.104
Potential issues with the WIG aircraft are as follows:
!Extensive weather flight planning could be required to exploit
tailwinds and avoid storms.


103 David Jensen, “Steering Clear of a Perfect Storm,” Aviation Today, Feb. 10, 2005.
104 Bill Sweetman, “Monster at 20 Ft.,” Popular Science, [http://www.popsci.com/popsci/
aviation/article/0,12543,410266,00.html ].

!Flight characteristics at low altitude may make it hard to control. One
of the WIG designers states the controls will need to be highly
automated.
!The size of the aircraft may make maneuvering it on the ground
difficult.
!The weight of the WIG may exceed the weight limits of most
runways and taxiways around the world
!Some critics of the WIG, have said that cruising altitude would be so
low that the aircraft would be at risk from rogue waves.105
!The vast size of the aircraft would mean a tremendous investment to
develop an operational product. Since it is very large, the WIG would
require more power for takeoff than for cruise. This would increase
the mass of the engines, thus reducing payload and aircraft
effi ci ency. 106
Seaplanes. The Office of Naval Research tasked the Center for Innovation in
Ship Design (CISD) to conduct a study on the utility of seaplanes in supporting the
Navy’s offshore Sea Base concept. It is thought that seaplanes with heavy lift
capability may be simpler to integrate with the Sea Base concept than conventional
aircraft. One of the potential missions would be bringing troops inter-theater to meet
up with their pre-deployed equipment.
Production of seaplanes has been very limited since the 1960s. Examples of
some modern era seaplanes are the Canadair CL-214 waterbomber, the Japanese Shin
Meiwa US-1A search and rescue aircraft, and the Russian large multi-purpose
seaplanes — the Be-200 and A-40.
Some of the issues addressed in the CISD final report, titled “Use of Seaplanes
& Integration within a Sea Base” are:
!Rough water operations. It is pointed out that rough water
operations are crucial during takeoff, landing, taxiing, cargo transfer,
and aircraft survival. Based on open ocean wave data, the report
states that a desirable goal for a Sea Based seaplane will be to have
full operational capability in sea state 4 (below 8 feet in significant
wave height), with limited operation in sea state 5 (below 13 feet in
significant wave height).
!Rapid takeoff and landing. The report suggests that rapid takeoff
and landing are important for high sea state performance to allow a
seaplane to rapidly leave or enter the water while avoiding adverse
motions and high fuselage loads.


105 Committee on Aeronautics Research and Technology for Vision 2050. Securing the
Future of U.S. Air Transportation: A System in Peril,” (National Academies Press:
Washington, 2003), p. 33.
106 Ibid.

!Mooring and docking. Ideally, most seaplanes are designed to be
physically lifted from the water when not in use. This is done to
protect the aircraft and reduce maintenance. As aircraft size increases
this becomes progressively more difficult. The alternative is to have
the seaplane “live” in the water. Even then, mooring and docking
capabilities will be needed.
!Ability to transfer a seaplane’s payload to a ship in various sea
states. A CISD innovation cell recommended a new method of
transferring payload using the Intermediate Transfer Station (ITS)
concept. This concept utilizes a large platform deck area for cargo
transfer. There is a high side and a low side to this deck. The deck
would become a floating seaplane ramp, which would allow
seaplanes to come onboard from the low side.
In a recent Massachusetts Institute of Technology project, a team designed a
“heavy lift amphibious seaplane” that was specifically designed to meet the
requirements for the Sea Basing concept.107 Their final design allowed a payload of
40,000 pounds and a cruise range of 3,000 nautical miles. The seaplane is amphibious
so it could transport cargo from remote land bases and land in the water to deliver its
payload. One of the unique design features of this seaplane was the way it would
deliver its payload. The seaplane was designed to deliver its payload through a “well
deck” on existing amphibious warfare ships. The seaplane would land, taxi to the
ship, insert its nose into a cushioned opening (called the auxiliary delivery system) on
the well deck. The cargo would then be extracted through its “clam shell” doors in
the nose of the seaplane. The report states that there are currently 54 naval vessels
over 7 ship classes that use well decks. The seaplane could also dock with a floating
platform and deliver cargo on beaches that are suitable for seaplane delivery. It had
one other unique feature - the ability to deploy its landing gear in water. This feature
could possibly allow the seaplane to do coastal delivery by driving up a water ramp.
Another design that some analysts
feel may have merit is Lockheed
Martin’s Surface Effect Aircraft (SEA).
It is primarily a seaplane, but uses two
technologies to enhance its capabilities.
The concept uses wing-in-ground effect
technology, as well as, surface effect ship
principles. The WIG technology would
assist in increasing its range capability by
approximately 25% if utilized. The
surface effect ship technology would
assist in getting the vehicle out of the
water faster, thus shortening the takeoff
Figure 11: SEAdistance and lessening propulsion
requirements.
Source: Lockheed Martin


107 Omar Bashir, Jean-Marc Freuler, David Smith, Matt Theis, Josh Walton, Brady Young.
Heavy-Lift Amphibious Seaplane for Enhancement of Seabasing, Massachusetts Institute
of Technology, Dec. 14, 2004.

Another innovation for the SEA is a modular concept. The designers believe that
different modules could be used depending on the type of mission. The two different
examples used were a Conventional Air-Launched Cruise Missile/Unmanned Aerial
Vehicle Launcher Module and a Cargo Module.
The SEA is designed to carry the same payload as a C-5, about 270,000 pounds,
with a range of 7,500 to 10,000 nautical miles depending on whether it is operating
in or out of surface effect. It has an operational goal of 300 - 400 knots at less than
200 feet, but can also fly at normal deployment altitudes. Lockheed Martin also
believes that the design may have potential for signature reduction, or “stealth”.
Critics of the seaplane have said that they require more propulsion than similarly
sized conventional aircraft to takeoff. There was also a concern in the takeoff and
landing phase due to floating debris.108
Summary of Potential Strategic Mobility Platforms
The table below (Table 2) summarizes the main characteristics of each of the
potential strategic mobility platforms. For comparison purposes, the Fast Sealift Ship
(FSS), the Large, Medium Speed, Roll-on/Roll-off (LMSR) ship, the C-17, and the
C-5 are shown. They are also lightly shaded.
Table 2: Summary of Potential Strategic Mobility Platforms
PlatformRange4Payload6 &Speed TakeoffDraftFeasibility1
(nm) Passeng ers (knots) and
LandingFY 06FY16FY163
Zo ne s w / tech
investment
Fast Sealift12,200200,000 sq.3336’ 7”In Service
Shipat 27ft. / 200 C-17
knots load s
Large12,000300,000 sq.2434’In Service
Mediumat 24ft. / 400 C-17
Speed Roll-knotsloads
on/Ro ll-off
Shallow4,50084,489 sq. ft.75 10’4”Marginally2
Draft High/ 4,400 stonsFeasible
Speed/ 1,000
Sealift passengers
Fast Sealift6,000158,000 sq.3835’Marginally2Marginally2Feasible
- Monohullft. / 8,000FeasibleFeasible
stons / no
passengers
Trimaran8,70088,500 sq. ft.5528’Feasible Marginally2Marginally2


High Speed/ 4,500 stonsat 40 knotsFeasibleFeasible
Sealift/ 1,000
passengers
108 Committee on Aeronautics Research and Technology for Vision 2050, Securing the
Future of U.S. Air Transportation: A System in Peril, (National Academies Press:
Washington, 2003), p. 33.

PlatformRange4Payload6 &Speed TakeoffDraftFeasibility1
(nm) Passeng ers (knots) and 3
LandingFY 06FY16FY16
Zo ne s w / tech
investment
Surface8,70097,700 sq. ft.6059.8’Marginally2
Effects Ship/ 4,500 stons/24.7’Feasible
High Speed/ 1,000
Sealift passengers
C-172,400170,900 lbs /450 3,000’In Service
85.45 stons /
102
passengers
C-52,150270,000 lbs /5188,300/In Service
135 stons /mph4,900
76
passengers
Global3,860459,000 lbs /4897,000’Marginally2Feasible
Range229.5 stons /Feasible
Transport 584
passengers
Super Short3,10072,000 lbs /3801,000’Marginally2Feasible
Take-Off36 stons orFeasible
and Land80
Ai rcraft passengers
C-176,30098,000 lbs4503,000’Marginally2Marginally2Feasible
Payload andmax(avg payload)FeasibleFeasible
Rangeferry/ 49 stons /
Expansion 102
Program passengers
Ultra Large5,600676,000 lbs /76CTOL -Marginally2Feasible
Airlifters338 stons />3,500’Feasible
76VTOL -
passengers 1,000”
Unmanned Feasible7
Ae r i a l
Vehicles -
Cargo
Wing-in-10,000 2.8 million300 mphNo DataMarginally7
Groundlbs / 1,400Feasible
E ffect stons
Ai rcraft
Seaplane -7,500 -270,000 lbs /300 -N/AMarginally7
Surface10,000135 stons400Feasible
E ffect s
Aircraft
Seaplane -3,00040,000 lbs /450N/AFeasible7
MIT20 stons
Notes:
(1) IDA feasibility assessments are based upon judgements that technology capabilities can be achieved with no
more than medium risk.
(2) Marginally feasible indicates that the assessed performance “nearly meets” the AMCS performance in the
judgement of the IDA analyst and/or may be feasible but at high risk.
(3) FY2016 w/tech investment - Fiscal Year 2016 with oriented technology investment.
(4) nm - nautical miles
(5) 9.8’ of draft is with the air cushion on. 24.7’ of draft is with the air cushion off.
(6) stons = short tons
(7) Based on assessment of the author using Technology Readiness Levels (TRLs). Achieving TRL5 should be
feasible for all medium and some high risk technologies. The scale of the WIG and SEA made them marginally
feasible. Both also use high risk technologies.



Congressional Oversight Issues
Strategic mobility innovation raises potential oversight issues for Congress in the
following areas:
!Does Congress have sufficient information about the DOD’s plans for
lift, and potential lift platforms, to adequately assess investment
options?
!To what degree, if any, should government funding be used to
develop new lift platforms?
!What mix of lift platforms might be appropriate to both meet future
U.S. commercial lift needs and potentially assist in meeting future
military strategic lift requirements?
!Should any of these lift platforms be developed and procured in part
to support the defense industrial base?
!Should procurement of airlift be expanded beyond current DOD
plans, and if so, by how much, and with what platforms?
Further Study of Investment Options
!Does Congress have sufficient information about the DOD’s plans for
lift, and potential lift platforms, to adequately assess investment
options?
Some analysts have noted that the following areas may require further study to
adequately assess investment options:
!High Speed Ships. Some analysts have stated that speeds in excess
of 50 knots may be detrimental to passengers on the open ocean.
Further open ocean study may be needed to examine the effects on
passengers in various sea states.
!Fast Sealift - Monohull. Further study may be required on “med-
mooring” to determine how many ports this type of ship can access.
Med-mooring is where the ship is perpendicular to the shore or pier.
Without dedicated terminal facilities, what ports would the Monohull
be able to access worldwide?
!Double stacking aircraft cargo may be one way to increase DOD
airlift capability. For many of the DOD’s current strategic assets,
analysts have found that platforms run out of floor space before
actually exceeding aircraft weight limits. To increase the current
airlift capacity, further study may be needed in bilevel cargo
loading(double stacking cargo). There currently are two Air
Expeditionary Force Battlelab initiatives addressing this idea. The
Bilevel Aircraft Loading System (BALS) and the Tactical Integrated



Packaging System (TIPS) are being examined as ways to increase
airlift capacity.109
!Ultra-Large Airlifters (ULAs). Further ULA studies may be
required in three areas: (1) The “foot print” required to support
operations for the CTOL and VTOL Crane variants. Analysts have
estimated that it may take up to the equivalent of 109 football fields
for the landing zone of the CTOL ULA and the equivalent of 3
football fields for the VTOL Crane. This could be a significant issue
if the desire is to land these ULAs in unimproved fields. (2) The
ballast required to offset fuel expenditure and cargo discharge.
Currently, the primary way of offsetting fuel expenditure and cargo
discharge is with water. Other ways may include the venting of a
lifting gas, vectored thrust, and onboard buoyancy control. (3) The
fabrics, yarns, weaves, and bonding technology for the ULA. The
size of the ULA is limited by the strength of the fabric. Bigger
envelopes require more plies of fabric. Faster seaming machines are
needed to bond (with heat) the thick fabrics.
!Seaplanes and Intermediate Transfer Station (ITS) concept. If
the Navy continues to pursue the Sea Base concept, then some
analysts have remarked that seaplanes (or even the wing-in-ground
effect aircraft), as well as the Intermediate Transfer Station (ITS)
concept may need further study. The feasibility of seaplanes that will
be designed to have heavy lift capability and operate in sea states 4
and 5 may require further study. The ITS concept represents one way
of getting the seaplanes out of the water and being able to offload
cargo/personnel. Is the ITS concept feasible? Other forms of mooring
and docking may also require further study.
Future Government Funding
Some of these future concepts appear to have little or no current commercial
attraction and consequently are likely to require substantial government funding,
unless ways are found to encourage commercial involvement. A potential oversight
question for Congress is as follows:
!To what degree, if any, should government funding be used to
develop new lift platforms?
Some analysts have highlighted these platforms or areas as possibly requiring
future government funding:
!Ship Research and Development (R&D). At this time, IDA
analysts have noted that no commercial or other R&D efforts are


109 For more on these initiatives, see [http://www.mountainhome.af.mil/AWB].

expected in the next 10 years for high-speed sealift issues.110 Without
targeted investment in high speed ship technology, the feasibilities of
the proposed future sealift platforms may not improve significantly.
IDA believed that further R&D was needed in three areas: (1)
installed propulsion systems; (2) impact of drag at high speeds (spray
drag, appendage drag, and interference drag); (3) challenges of
operating ships over 50 knots (e.g. controlling dangerous rolling
motions and accelerations).
!Shallow Draft, High Speed Sealift (SDHSS). Many sources have
noted the desirability of a shallow draft, high speed ship. Proponents
of this ship have said that the high speed and shallow draft are
requirements for future wartime engagements, in order to provide
options when confronted with anti-access or area denial scenarios.
On the other hand, critics of the ship have stated that the cavity
catamaran technology has never been proven on a large scale. To
date, the Florida-based ship designer, Howard Harley, has only
manufactured vessels with this design on a much smaller scale. The
High Speed Sealift Innovation Cell, a joint effort funded by the Navy
and OSD, published a Technical Development Plan that identified
$1.2 billion in potential R&D efforts, with the preponderance going
to gas turbine research ($700 million).
.
!Global Range Transport (GRT). There is a limited commercial
interest in this blended wing body concept. If this concept is to
become reality, then the majority of the funding for the GRT would
need to come from the government. The technology from the B-2
stealth bomber program could be leveraged to possibly decrease
costs. Also, if there is an industry demand, the government could
seek agreement to recoup RDT&E costs.
!Super-Short Take-Off and Landing (SSTOL) Aircraft. There is
again a limited commercial application for this concept. If this
concept is to become a reality, then future government funding would
most likely be required. The technology from the V-22 Osprey could
be leveraged to reduce RDT&E costs. For this system to become
achievable, analysts maintain that research would be required in
high-lift technology, flight control integration, propulsion, and
composite structures.
!Ultra-Large Airlifter (ULA). In April 2004, the Defense Advanced
Research Projects Agency initiated a program to develop a 500-ton
ULA that can fly 6,000 miles in four days. Phase I, which included
system studies and development of a notional concept of the objective
vehicle, has been completed, and Phase II, which will cost $50
million, will produce a 30-ton Advanced Technology Demonstrator
by 2007, which the U.S. military will use to evaluate the concept. If


110 James Fein et al., op. cit., p. 7.

all goes well, a full-scale Phase III vehicle could then be developed
and evaluated for potential production. Congress appropriated $10
million dollars to the Walrus program in the FY2005 budget. It’s
Program Element (PE) number is PE 0603285E, R-1 #32. The
Walrus program falls under the Advanced Aerospace Systems
project. 111
!Seaplanes. The sea-based aircraft program may require extensive
technology maturation. No significant seaplane technology advances
have really occurred since the 1960s.
Commercial Applicability
Some of these future lift platforms may have direct commercial applicability.
The potential oversight question for Congress is as follows:
!What mix of lift platforms might be appropriate to both meet future
U.S. commercial lift needs and potentially assist in meeting future
military strategic lift requirements?
Some analysts have noted that the following platforms may have some future
commercial applicability:
!Mobilus Initiative. The Center for Army Analysis (CAA) is
studying ways to develop a commercial Ultra Large Airlifter (ULA)
capacity, which then could be accessed for military and/or
government use (similar to the Civil Reserve Air Fleet). The112
“Mobilus Initiative” seeks to use a balanced, cost sharing
public/private partnership. The idea is to create a broad and deep
mobility capability in the private sector that would be available for
military use. The Mobilus Initiative will determine what would be
required to bolster the lighter-than-air industry, which will be
complementary to the current aerospace industry.113
!Unmanned Aerial Vehicles (UAVs). There does appear to be a
commercial interest in an airlift UAV (e.g. FedEx). Once the national
airspace system (NAS) concerns are addressed, then a joint
DOD/commercial venture may be feasible. “Access 5” is a
government/industry partnership made up of NASA, DOD, the FAA,
along with UAV builders Boeing, Northrop, Grumman, Lockheed
Martin, General Atomics, Aerovironment, and Aurora Flight


111 For more on the budget activity of the Walrus program, see [http://www.dtic.
mil/descriptivesum/Y2005/DARPA/0603285E.pdf].
112 Michael Woodgerd, LTC, USA, Center for Army Analysis, interview by author,
Washington, Feb. 15, 2005.
113 For more info on the Mobilus Initiative, see [http://www.sddc.army.mil/frontDoor/

0,1865,OID=5 — 180 — -13061,00.html].



Sciences. Access 5 was formally launched in Fiscal Year 2004 under
a $101 million NASA grant114. The organization’s goal is
unrestricted UAV “file and fly” access to civil airspace within five
years (or 2009). A detailed national plan outlines 1,400 tasks
required to develop and integrate technologies, policies and
procedures, and aviation infrastructure.115
!Fast Sealift - Monohull. The Fast Sealift - Monohull is being
developed for commercial application. This technology could be
leveraged for military application with little cost to the DOD.
Currently, FastShip Atlantic, Inc., is the lead for this technology.
Spanish ship builder IZAR is due to begin construction once
financing is in place. FastShip Atlantic is hoping to begin
commercial service in 2008.116
!Blended-wing-body (BWB) aircraft. According to a National
Research Council study, two airlines have expressed interest in
purchasing blended-wing-body (BWB) aircraft if they are developed.
Some of the concerns that the BWB aircraft will have to overcome
are: passenger acceptance of cabins with few or no windows; how to
handle emergency evacuation of the large passenger cabins; how to
incorporate such a large aircraft into the existing airport
environment.117
Industrial Base
The potential oversight question for Congress is as follows:
!Should any of these lift platforms be developed and procured in part
to support the defense industrial base?
The following points address the defense industrial base question:
!The Navy’s FY2006 - FY2011 ship-procurement plan would procure

49 ships over these six years. The Littoral Combat Ship (LCS)


accounts for 21 of these 49 ships. The LCS will be built by yards
other than the six ship yards that have built the Navy’s major war


114 William Reynish, “UAVs Entering the NAS,” Aviation Today, Feb. 10, 2005.
115 For more information on Access 5, see [http://www.access5.aero].
116 For more info on FastShip Atlantic, see [http://www.fastshipatlantic.com/
content_aboutfastship.html ].
117 Committee on Aeronautics Research and Technology for Vision 2050, Securing the
Future of U.S. Air Transportation: A System in Peril, (National Academies Press:
Washington, 2003), p. 33.

ships in recent years.118 That means that the “big six” ship yards will
have to compete for the remaining 28 ships over those six years,
which accounts for an average procurement rate of 4.7 ships per year.
For these six ship yards, this average procurement rate could result in
relatively low work loads, revenues, and employment levels.119 The
high speed ships examined in this report, if procured, may be helpful
in maintaining the U.S. industrial capabilities needed for
development and production of advanced sealift.
!All of the strategic mobility concepts examined in this report
represent future innovation. Some observers have noted that if the
U.S. is to maintain a competitive lead in the development and
production of airlift and sealift, while also possibly creating new
industries (e.g., an Ultra Large Airlifter industry), new jobs, and new
marketable skills (e.g., in the blended wing body technology), then
future investments in these types of platforms may be required.
Future Procurement
The potential oversight question for Congress is as follows:
!Should procurement of airlift/sealift be expanded beyond current
DOD plans, and if so, by how much, and with what platforms?
Some of the areas that may affect this question are as follows:
!Million-Ton-Mile per Day (MTM/D) Airlift Gap. In the Mobility
Requirements Study 2005 (MRS-05), it stated that a 48.3 million-ton-
mile per day (MTM/D) capability should exist with 120 C-17s, a C-5
mission capable (MC) rate of 65% (for all 106 C-5s), and a Civil
Reserve Air Fleet contribution of 20.5 MTM/D. Air Mobility
Command currently has 119 C-17s and the C-5 MC rate seems to be
hovering around 68% for FY2005, but the DOD’s current airlift
capability is estimated to be approximately 45 MTM/D, leaving an
estimated gap of 3.3 MTM/D from the projected capability. If the
current projected requirement is approaching 60 MTM/D (as some
analysts have estimated), then there is indeed an even larger gap in
the U.S. military airlift capability. MRS-05 stated that 176 C-17s
were required, with a C-5 mission capable rate of 65%, to achieve a
MTM/D capability of 54.5. Thus, even when the Air Force gets
ownership of all 180 C-17s on contract, there could be a projected


118 These six yards include Bath Iron Works of Bath, ME, the Electric Boat Division
of Groton, CT, and Quonset Point, RI, National Steel and Shipbuilding Company of San
Diego, CA, Avondale Shipyards near New Orleans, LA, Ingalls Shipbuilding of Pascagoula,
MS, and Newport News Shipbuilding of Newport News, VA.
119 See CRS Report RL32814, Navy Force Architecture and Ship Acquisition: Selected
FY2006 Issues for Congress, by Ronald O’Rourke, for more information on industrial base
implications.

gap of at least 5.5 MTM/D. The C-17 production line is currently
planned to close in 2008. If this airlift gap is to be filled, then some
observers have noted that it can either be filled by procuring more C-

17s or by procuring some mix of future strategic airlift platforms.120


!Potential Platforms. In the Office of Force Transformation’s 2004
Strategic Transformation Appraisal, it listed three pertinent “issues
of regret,” which are key technologies that — if not explored —
could be in the future viewed as significant lost opportunities: (1) a
super short takeoff and vertical landing platform; (2) a heavy-lift
vertical takeoff and landing aircraft (3) a shallow draft high-speed
vessel with strategic reach.121 In the Executive Summary of the
Advanced Mobility Concepts Study (AMCS), the Executive
Committee recommended that OSD include appropriate direction in
POM Strategic Planning Guidance to initiate RDT&E on the
following strategic platforms: Shallow Draft High Speed Vessels,
Super Short Takeoff and Landing aircraft, and the Global Range
Transport. It also recommended that the ULA continue as a platform122
for further related studies.
!Future Requirements. No matter what future platforms are selected,
the AMCS identified the following requirements for future mobility
assets: (1) reduced dependency on fixed infrastructure; (2) the ability
to enter through multiple, unimproved entry points; (3) the ability to
swiftly move forces in combat-ready configurations; (4) the ability to
conduct vertical maneuver; (5) the ability to close the gap between
deployment and employment momentum.123


120 It is estimated that for every 10 additional C-17s that Air Mobility Command procures
that they would get roughly one MTM/D more of capability. The 42 C-17s that the Air
Force is currently requesting would provide an estimated 4.2 MTM/D of capability.
121 Amy Butler, “Pentagon Transformation Analysis Outlines Military Capability Gaps,”
Defense Daily, Nov. 19, 2004.
122 U.S. Department of Army, Advanced Mobility Concepts Study, Dec. 2003, p. vii.
123 Ibid., p. iii.